Download Print this page

Bresser 88-59493 Instruction Manual page 5

Planetarium

Advertisement

Parts list:
Stand with Battery compartment
and slit for On/Off switch
Upper mounting plate
Star map
semi-transparent projector dome
Distance piece („Pillars") (3 pieces)
On/Off switch
Screwdriver
Red connecting cable
Red connecting cablefor LED (already connected)
Black connecting cablefor LED (already connected)
Label (hours)
Fixing screws (2 pieces)
Plastic tubes (4 pieces)
Battery plates A
Battery plates B
Battery plates C
LED (1 piece)
Batteries, Type AA, 1.5V (2 pieces)*
* not included
How to assemble?
Step 1: Insert the LED
Insert the LED (17) into the small hole in the middle of the
stand. Check if the LED is firmly installed (See Picture 1).
Step 2: On/Off switch hook up
Put a transparent tube on one side of the red conducting
wires of the bulb foundation in the battery holder, and
connect it with one side of the switch. Move the transpa-
rent tube to the end of metal switch, and connect the red
conducting wire with the metal part in the middle of the
switch. Move the transparent tube to the middle of the
metal switch, put the switch through the square hole in the
body, then put two screws in two holes and tighten them.
Step 3: Install the battery plates
(1)
Put a transparent tube on one side of the black conduc-
ting wire of the bulb foundation, and connect it with the
negative shrapnel. Put a transparent tube on the other
side of the red conducting wire of the switch and connect
it with the positive shrapnel. Place the battery shrapnel (As
Shown in Picture 2 shows). Please note the positive and
negative pole shrapnel, don't mistake them.
(2)
Fix the bulb according to the bulb threads direction. Make
sure it contacts well.
Step 4: „Pillars" installation
Put the distance pieces (5) into the holes of the
foundation.
GB
(3)
(4+5)

Advertisement

loading