Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
11
12
Note:
Recycler blades (sold separately) are required to install this kit; refer to the Parts Catalog for your
machine.
Description
No parts required
No parts required
No parts required
No parts required
No parts required
Left baffle support
Center/right baffle support
Flanged capscrew (5/16 x 3/4 inch)
Flange locknut (5/16 inch)
Carriage bolt (5/16 x 1-1/4 inches)
Baffle (right)
Baffle (center)
Baffle (left)
Carriage bolt (3/8 x 1 inch)
Flange locknut (3/8 inch)
Kicker fitting
Carriage bolt (3/8 x 1 inch)
Flange locknut (3/8 inch)
Recycler blades (sold separately)
No parts required
No parts required
Flange-head capscrew (3/8 x 1 inch)
Qty.
–
Prepare the mower.
–
Open the engine guard.
–
Remove the left belt cover.
–
Remove the existing blades.
–
Drill the mower deck.
1
2
2
Install the baffle supports.
6
4
1
1
1
Install the baffles.
9
9
3
6
Install the kicker fittings.
6
3
Install the recycler blades.
–
Install the left belt cover.
Install the guard extension and close
–
the engine guard.
Convert the deck for rear-discharge
8
operation.
2
Use