INSTALLATION OF THE HORIZONTAL AIR/FLUE DUCT (REAR OUTLET)
402
171
1
3
Fig. 3.3
(TURBOMAX AND THERMOCOMPACT ONLY)
174,5
2
1
• Secure the boiler hanging bracket
(1) to the wall using the screws
provided (2).
• At this stage it is necessary to
prepare and fit the boiler onto the
hanging bracket – refer to the
boiler installation instructions.
15