Connection test
The test is used to verify proper communication between DY365 and the remote actuator. It's possible to test multiple channels
simultaneously*.
During the test a series of on-off commands are sent every 5 seconds to the relay in test. It's possible to exit the test:
- by pressing the key
to exit the test and test another channel
- by pressing the key
to exit the test and return to the main page
* See "Channels selection" on page 27
- 59 -
User manual DY365