Periodic Maintenance; Weekly; Every Six Months - Presto Lifts P3 All-Around Air Owner's Manual

Table of Contents

Advertisement

6.2

Periodic Maintenance

Before each use inspect the machine for damage or wear. If damage or wear is found remove
the machine from service and repair before using.

6.2.1 Weekly

Inspect upper and lower rollers, roller pins and bushings, and roller tracks. Replace as
necessary.
Inspect upper and lower hinge pins and bushings. Replace as necessary.
Inspect motion actuator for signs of leaking and/or damage. Repair/replace as necessary.
Inspect center pins and bushings. Replace as necessary.
Inspect rotator ring, rotator ring washer, and bearings. Ensure the rotator rings rotates
smoothly without binding. Repair or replace bearings as necessary.
Inspect base frame, platform, and leg set for wear or damage.

6.2.2 Every Six Months

Perform weekly maintenance
Apply dry PTFE lubricant to all pivot points, rollers, and bearings.
AIR RESERVOIR
AIR ACTUATOR
ROLLERS/TRACKS/PINS
(BOTH SIDES)
Presto Lifts
ROTATOR RING
PIVOT WASHER
MAIN SHAFT PINS
(BOTH SIDES)
15
ROTATOR
RING/PLATFORM
8X ROTATOR
RING BEARINGS
MAINTENANCE PINS
(BOTH SIDES)
ROLLERS/TRACKS/PINS
(BOTH SIDES)
P3 All-Around Air Manual

Advertisement

Table of Contents
loading

Table of Contents