ZIEHL-ABEGG ZAS Series Amendment Of The Original Operating Instructions

ZIEHL-ABEGG ZAS Series Amendment Of The Original Operating Instructions

Regular maintenance and testing of elevator machines

Advertisement

Quick Links

Amendment of the original operating
instructions
Regular maintenance and testing of ZAS
elevator machines
ZAS0, ZAS1, ZAS2, ZAS3
Regular maintenance and testing of ZAS elevator machines
ZIEHL-ABEGG SE | Heinz-Ziehl-Straße | 74653 Künzelsau | Tel. +49 7940 16-0 | drives@ziehl-abegg.de |
A-TIA19_07-GB
Article no.. 01013457-GB
This service manual must be kept
as part of the drive's inspection logbook!
Issue: 1936
A-TIA19_07-GB
ZAS0
ZAS1
ZAS2
ZAS3
Index 001
Erstellt am: 02.09.2019
www.ziehl-abegg.de

Advertisement

Table of Contents
loading

Summary of Contents for ZIEHL-ABEGG ZAS Series

  • Page 1 Regular maintenance and testing of ZAS elevator machines This service manual must be kept as part of the drive’s inspection logbook! ZIEHL-ABEGG SE | Heinz-Ziehl-Straße | 74653 Künzelsau | Tel. +49 7940 16-0 | drives@ziehl-abegg.de | www.ziehl-abegg.de A-TIA19_07-GB Article no.. 01013457-GB...
  • Page 2: Table Of Contents

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Content General information ............Importance of service instructions for regular inspection and maintenance of ZAS elevator machines .
  • Page 3: General Information

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 General information 1 General information Importance of service instructions for regular inspection and maintenance of ZAS elevator machines Figure 1 - ZAS elevator machine These service instructions describe regular inspection and maintenance of ZAS0, ZAS1, ZAS2 and "...
  • Page 4: Requirements Placed On The Personnel / Due Diligence

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Safety instructions Information Important additional information and advice for user. Requirements placed on the personnel / due diligence Danger! " Installation, connection to the power supply and commissioning may only be performed by qualified service personnel! The relevant regulations must be observed! Persons entrusted with the planning, installation, commissioning and maintenance and servicing in "...
  • Page 5: Inspection Intervals And Regular Maintenance Work

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Inspection intervals and regular maintenance work 3 Inspection intervals and regular maintenance work Information All maintenance and service work must be performed carefully and only by well-trained personnel. " The guarantee conditions include keeping the inspection intervals! Measures Intervals Remarks...
  • Page 6: Flank Backlash Measurement

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Flank backlash measurement Note: The fixing screws of the freaction sheave and the safety brake are marked by locking varnish. Loosening of the screws is therefore visually recognisable. If a screw should turn, it must be retightened with the prescribed torque, the old locking varnish removed and remarked.
  • Page 7 Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Flank backlash measurement Figure 2 1 Marking 1 2 Marking 2 3 Reference point Maximum permitted flank clearance for simplified measurement Drive Gear Brake drum di- Gear ratio Number of Number of Maximum permitted ameter teeth turns...
  • Page 8: Comprehensive Flank Backlash Measurement

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Flank backlash measurement Comprehensive flank backlash measurement 4.3.1 Tools required • Dial gauge • Screw clamp • Flat wrench, size 10 mm • Light 4.3.2 Requirements the ropes are removed from the traction sheave "...
  • Page 9: Measured Values

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Flank backlash measurement repeated for the other side of each tooth. If very distinctive pitting is visible the maximum permitted flank backlash c of 3 mm is to be limited to 2.2 mm, see Figure 4 - distinctive pitting. Figure 4 - distinctive pitting 4.3.4 Measured values:...
  • Page 10: Measuring Report

    Service instructions ZAS0, ZAS1, ZAS2, ZAS3 Flank backlash measurement 4.3.8 Measuring report System: Elevator: Gear type: Gear serial number: Year of construction: Gear ratio: Number of trips: Measuring instrument: Measurement performed by: Measurement performed on: Measured values: Outer diameter of traction sheave Distance from outer diameter to measuring point Measuring radius meas...
  • Page 11: Visual Inspection Of Nut Fitting

    Figure 4 - Incorrect nut fitting Attention! If a nut fitting is incorrect, shut down the system. Contact the ZIEHL-ABEGG SE customer service. See back page for contact details. We recommend noting performance of the check and its results in the elevator documentation.