Setting up – vertical Models
2.4
The EVA and EVC vertical models must have their stands assembled, the furnace mounted on the
stand and their work tubes fitted before they can be used.
Assembling the stand and mounting the furnace - (Tools required: 4mm Hex key.)
The assembly of the vertical stand is as follows with reference to Figure 2-9, Figure 2-10 &
Figure 2-11:
 Place the vertical stand base item (1) on the floor or bench on which it is to be assembled.
 Position the vertical stand upright (2) on the stand base in line with the fixing holes.
 Secure the stand upright to the base using the 6x M6 dome cap screws (4) and washers (3)
supplied.
 Partially screw in the top M6 screw knobs, 2x (6) into the frame upright as shown in Figure
2-11.
 Hook the EVA/EVC/EVT/EVZ furnace onto the top screw knobs. This may take 2 people
to lift the furnace.
 Fit the bottom screw knobs x2 and tighten all four.
Figure 2-9. EVA vertical model mounted on its stand.
Index to numbered items in Figure 2-10
and Figure 2-11
1. Vertical stand base
2. Vertical stand upright
3. Fixing screws M6x16 dome cap screw
4. Washer M6
5. EVA/ EVC Tube furnace
6. M6 screw knob
8
Figure 2-10. Assembling the EVA vertical stand.
Figure 2-11. Mounting the EVA/EVC onto the vertical stand