Before You Begin - IBM N Series Installation Manual

System storage 10g cluster-mode switch
Hide thumbs Also See for N Series:
Table of Contents

Advertisement

Before you begin

Site preparation
Verify package
contents
22
The location and conditions of the place where you decide to install the CN1610
must conform to the following guidelines:
u
The location must be clean, dry, and well ventilated.
u
The location must meet the specifications described in
specification" on page 18.
u
The installation site must have sufficient space to allow access to the front
and back panels of the switch.
u
The system and port LEDs must be visible.
u
The power cord must be able to reach from the power socket on the switch to
a properly-grounded power source.
u
The cable length from the copper Ethernet port to the connected device must
not exceed 328 feet (100 meters).
u
The cable length from the SFP ports must not exceed recommended lengths
for the cable and transceiver module type.
u
The ventilation holes on the front and rear panels must not be obstructed in
order to provide proper airflow through the switch.
u
The cabling must be routed away from sources of electrical interference such
as power lines and fluorescent lighting fixtures.
The CN1610 package includes the following contents:
u
CN1610 switch
u
Software license and warranty information
u
Rack-mount installation kit
u
RJ45 to DB-9 console cable
u
Four SFP+ direct attach copper cables
Power cables are a separate item and not included in this package. If any item is
missing or damaged, contact your authorized IBM N series sales representative
immediately.
The following table lists the parts included in the slide rail box:
"Environmental
Before you begin

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cn1610

Table of Contents