Download Print this page

David Engineering & Mfg PDR UPM50 Instructions page 3

Ceiling/wall

Advertisement

ADAPTER PLATE ASSEMBLY
1: Start by screwing the leveling barrels ( F ) into the Adjustable arm (Q and R). A screwdriver slot is provided in the barrel ( F ) .The barrels only
need to be threaded approx. 1/8 " through the bottom of the arm (Q and R) If the mounting plane of the projector is not flat ,the barrels can be
adjusted to make up the difference in height.
2: Using the adapter plate ( S ) attach the adjustable arms ( Q,R ) with the hardware supplied (G,H,K) No need to tighten at this time.
3: Place the Universal adapter plate onto the projector. (See fig 4) Using the proper hardware supplied ( screws L,M,O or P) (washers I or J )
lightly fasten to the projector.
4: Position the universal adapter plate approx over the center of the projector, tighten the screws to the projector and then tighten the Plastic knobs
( K ). Be carful to not over tighten the projector screws. Damage to the projector may occur if the screws to the projector are over tightened.
See fig 2b for details
ADAPTER PLATE HARDWARE
F
G
H
9/32" x 47/64" Nylon washer 4 pcs
I
4.3 mm x 8.9mm steel washer 4pcs
2.7mm x 6mm steel washer 4 pcs
J
Note: must be used with washer "I"
K
L
M6 x 25mm Pan Head Philips machine Screw 4 pcs
M
M4 x 25mm Pan Head Philips machine Screw 4 pcs
O
M 3 x 25mm Pan Head Philips machine Screw 4 pcs
P
M2.6 x 25mm Cheese Head slotted machine Screw 4 pcs
Q
R
S
Leveling barrels 4 pcs
1/4-20 x 5/8 carriage bolts 4 pcs
Black plastic knob 4 pcs
Adjustable arm (left) 2 pcs
Adjustable arm (right) 2 pcs
Adapter plate 1 pc
Fig 2b
K
F
H
S
Q
3
L,M,O, OR P
I OR J
G
R

Advertisement

loading