Best Barns USA Assembly Book Revised July 9, 2019 ;)#*3#(0%<#D2 Arlington II B@E%F%@AE Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'.%(,1%82%+,-#237%#(%6",*2%,/%#(%-'/17%6#1",)1%+,($2(1%9/,&%:2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4 >%%?,-./#0"1%@ABC...
Page 2
MPORTANT NFORMATION BOUT !"'(N%.,)%9,/%-)/+"'$#(0%,)/%N#14%L*2'$2%/2'3%1"2%9,**,6#(0%#(9,/&'1#,(%829,/2%820#((#(0%+,($1/)+1#,(4 J*6'.$%+"2+N%6#1"%.,)/%*,+'*%QRJ%,/%8)#*3#(0%+,32%,99#+2%9,/%'(.%/2O)#/2&2(1$%,/%/2$1/#+1#,($4 I*,,/S ],,3%9*,,/#(0%#$%$,*3%,-1#,('**.4%^,)%&'.%+",,$2%1,%8)#*3%.,)/%,6(%,/%-,)/%'%+2&2(1%-'34 Always wear safety glasses when cutting or nailing! !,,*$%:2O)#/23S Q'(3%,/%?#/+)*'/%<'6 U2V2* <'921.%Z*'$$2$ ?,/3*2$$%T/#** H2'$)/#(0%!'-2 T)$1%H'$N Q'&&2/ WEGCE%U'332/X$Y L"#**#-$%<+/263/#V2/ L2(+#* I/'&#(0%<O)'/2 J33#1#,('*%H'12/#'*$%G%Not included in kit: :2O)#/23S <"#(0*2$%,/%&21'*%/,,9#(07%T/#-%M3027%:,,9#(0%['#*$%,/%<+/26$7%L'#(1 R-1#,('*S ?')*N7%:#302%\2(1 Primed Siding Detail !2/&#(,*,0.S <O)'/2%G%?,(9#/&%+,/(2/$%'/2%'1%_A%320/22$ LAP Edge L*)&8%G%?,(9#/&%6'**$%'(3%1/)$$2$%'/2%$1/'#0"1%V2/1#+'**.
Page 3
Details for Optional Deluxe Floor System I,)(3'1#,(%$#D2%#$%B@EGAd%F%@AEGAd4%%?"2+N%*,+'*%8)#*3#(0%+,32$%#(%.,)/%'/2'7%1"2%+,($1/)+1#,(%&'. "'V2%1,%+"'(024%%I,/%'%+,(+/212%$*'87%#($1'**%$#**%$2'*2/%'$%'%&,#$1)/2%8'//#2/%821622(%1"2%+,(+/212 '(3%1"2%6'**%-*'12$4%%I,'&%$#**%$2'*2/%+'(%82%-)/+"'$23%'1%",&2%+2(12/$%#(%/,**$%iGBh@d%,/%6#32/4 B4 <1'002/%1"2%`F`%1#&82/$%'$%$",6(%82*,64%%?)1%X@Y%16,%@F`G%CE%8,'/3$%#(1,%@E%*,(0%8*,+N$ 1,%$2+)/2%1"2%`F`$%6"2/2%1"2.%8)11%1,021"2/4 15-1/4" 16" 16" @4 ?)1%X@Y%16,%@F`GCE%1,%'%*2(01"%,9%CE%GAd4%%!"2. 6#**%82%)$23%9,/%1"2%b,#$1%"2'32/$4%%U'.,)17%9/,& *2917%9,/%BWd%,(%+2(12/%b,#$1%$-'+#(04%%EeE%&'/N$ 6"2/2%9*,,/%b,#$1%6#**%82%-*'+234 i4 ?)1%XBfY%$2V2(122(%@F`GB@E%1/2'123%8,'/3$%1,%BBE%G_d4%!"2$2%6#**%82%1"2%9*,,/%b,#$1$4%Treated lumber may be thicker than 1-1/2". Take this into account when cutting the length of floor joists. Shorten joist measurements if necessary to obtain 12'-0" building width. `4 =($1'**%1"2%9*,,/%b,#$1$%+)1%'8,V2%821622(%1"2%CE%b,#$1%"2'32/$4%<2+)/2%6#1"%BW3%0'*V4%32+N%('#*$4 K4 L*'+2%9*,,/%'$$2&8*.%,V2/%1"2%`F`$4%%<O)'/2%9*,,/%'$$2&8*.4%%H2'$)/2%1"2%9*,,/%3#'0,('**.
Page 4
Step 1 Assemble 12' Back Wall Wall Plate B``d B4 ?)1%X@Y%16,%@F`GB@E%1,%'%*2(01"%,9 B``d4%L,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%EeE%%&'/N$%6"2/2%1"2 24" 6'**%$1)3$%6#**%82%*,+'1234 23-1/4" 24" 144" Wall Plate Pre-Cut Wall Studs Depending on your location pre-cut wall studs vary in length from 92-1/4" to 93". This doesn't affect construction. @4 =($1'**%XfY%$2V2(%-/2G+)1%6'**%$1)3$%821622(%1"2%1,-%a%8,11,&%-*'12$4 ['#*%$1)3$%1,%6'**%-*'12$%6#1"%BA3%$#(N2/$7%X@Y%16,%('#*$%,(%2'+"%2(34! i4 <O)'/2%6'**%9/'&24%H2'$)/2%1"2%6'**%3#'0,('**.%X+,/(2/%1,%+,/(2/Y4%!"2(%&2'$)/2...
Page 7
Step 5 Assemble 96' Side Wall with Door B4 L,$#1#,(%X@Y%16,%_Wd%*,(0%8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%EeE%%&'/N$%6"2/2%1"2%6'** $1)3$%6#**%82%*,+'1234 23-1/4" 23-1/4" 37-1/2" Door Opening 27-3/4" 27-3/4" @4 =($1'**%XWY%$#F%-/2G+)1%6'**%$1)3$%'(3%'%ifGBh@d%-/2G8)#*1%3,,/%"2'32/%821622(%1"2%6'**%-*'12$4 !"2%3,,/%"2'32/%#$%-'+N23%#(%1"2%3,/&2/%N#14%['#*%1"/)%1,-%-*'12%6#1"%BA3%$#(N2/$4 Pre-built Door Header packed in dormer kit 2x4 Header Supports cut to length i4 <2*2+1%X@Y%16,%-/2G+)1%6'**%$1)3$%'(3%+)1%1"2$2%1, *2(01"%'(3%#($1'**%)(32/%1"2%3,,/%"2'32/4 Note: A 1/2" or 3/4" shim may need to be installed to the bottom of the header depending on the length of the pre-cut studs.
Page 8
Step 6 Assemble Front Wall Frame B4 ?)1%X@Y%16,%@F`GB@E%8,'/3$%1,%'%*2(01"%,9%B``d%9,/%6'**%-*'12$4%L,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%EeE%H'/N$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 Install these Studs Centered 33" 33" @4 =($1'**%XWY%$#F%-/2G+)1%6'**%$1)3$%821622(%1"2%6'**%-*'12$%6"2/2%$",6(4 i4 ?)1%X@Y%-/2G+)1%$1)3$%1,%' 2x4 Blocks *2(01"%,9%fCGBh@d%'(3%#($1'** nail nail 2x8 Door Header '$%"2'32/%$)--,/1$%6"2/2 $",6(4%['#*%1,%$1)3$%6#1"%BA3 $#(N2/$4 `4 =($1'**%1"2%3,,/%"2'32/%,(%1"2 @F`%"2'32/%$)--,/1$4%['#*%1, 1"2%$1)3%6#1"%BA3%$#(N2/$4 78-1/2" Header Support K4 :2&,V2%'%@F`%$+/2623%1,%1"2 -'**214%H2'$)/2%$-'+2%821622( "2'32/%'(3%1,-%-*'124%?)1%X`Y 9,)/%-#2+2$%1,%1"#$%*2(01"4 MV2(*.%$-'+2%-#2+2$%'(3%('#*...
Page 9
Step 7A Set Walls B4 M/2+1%8'+N%6'**%'(3%BAE%$#32%6'**%9/'&2$4% =($1'**%1"2%$#32%6'**%9/'&2$%6#1"%1"2 IMPORTANTS% E?E%&'/N$%,/#2(123%'0'#($1%1"2%8'+N%6'**%-'(2*%'(3%9/,(1%6'**%+,/(2/4%<2+)/2%6'**$%1,021"2/%'1 1"2%+,/(2/4%5$2%X`Y%9,)/%BA3%$#(N2/$%+,/(2/4%;/'+2%6'**$%6#1"%-/2G+)1%6'**%$1)3$%1,%",*3%6'**$ $2+)/2%'(3%-*)&84 @4 <1'/1#(0%'1%/#0"1%+,/(2/%#($1'**%'%9)**%6#31"%$#3#(0%-'(2*%6#1"%1"2%EUJLE%2302%9*)$"%6#1"%1"2%$#3#(0 ,(%8'+N%6'**4%<#3#(0%$",)*3%2F12(3%ih`d%82*,6%8,11,&%-*'124%['#*%$#3#(0%1,%8'+N%6'**%'(3%'** @F`$%)$#(0%W3%0'*V4%('#*$%$-'+23%Cd%'-'/14 Tip: If you are erecting building on a wood floor insert nails between the 3/4" floor sheathing and the 2x4 floor frame. Rest the siding on the nails while nailing to frame.
Page 10
Step 7B Set Walls continued `4 M/2+1%1"2%9/,(1%3,,/%6'**%-'(2*%'(3%1"2%XiY%1"/22%$#32%6'**%9/'&2$4%IMPORTANTS%=($1'**%1"2 WCGBh@d%*,(0%$#32%6'**%9/'&2$%6#1"%1"2%E?E%&'/N$%,/#2(123%'0'#($1%1"2%8'+N%'(3%9/,(1%6'**%-'(2*$4 <2+)/2%6'**$%1,021"2/%'1%1"2%+,/(2/$4%5$2%X`Y%9,)/%BA3%$#(N2/$%-2/%+,/(2/4%;/'+2%6'**$%6#1"%-/2G +)1%6'**%$1)3$%1,%",*3%6'**$%$2+)/2%'(3%-*)&84 K4 <1'/1#(0%'1%*291%+,/(2/%#($1'**%'%9)**%6#31"%$#3#(0%-'(2*%6#1"%1"2%EUJLE%2302%9*)$"%6#1"%1"2%$#3#(0 ,(%1"2%8'+N%6'**4%<#3#(0%$",)*3%2F12(3%ih`d%82*,6%8,11,&%-*'124%['#*%$#3#(0%1,%9/,(1%6'**%'(3 '**%@F`$%)$#(0%W3%0'*V4%('#*$%$-'+23%Cd%'-'/14 W4 =($1'**%'%$2+,(3%9)**%6#31"%$#3#(0%-'(2*4 f4 ;29,/2%#($1'**#(0%1"2%(2F1%$#3#(0%-'(2*%+)1%1"2%$#3#(0%9*)$"%6#1"%$#32$%'(3%1,-%,9%3,,/%,-2(#(04 C4 =($1'**%1"2%/2&'#(#(0%$#3#(0%-'(2*$4 _4 U,+'12%6"2/2%.,)%6'(1%1"2%6#(3,6$7%packed in the dormer carton7%'(3%+)1%,-2(#(0$%#(%$#3#(04 ]#(3,6%#($1'**'1#,(%#($1/)+1#,($%'/2%#(%1"2%6#(3,6%8,F4 BA4 ?)1%'(3%/2&,V2%8,11,&%@F`%9/,&%3,,/%,-2(#(0$4 BB4 ['#*%6'**$%1,%9*,,/%1"/,)0"%8,11,&%-*'124%<-'+2%BA3%$#(N2/$%@`d%'-'/14 Back Wall End Marked 'C' Cut Window Opening Cut Siding Flush with Opening Siding Extends 3/4"...
Page 11
Step 8 Install 2x4 Tie Plates B4 =($1'**%'%@F`GCE%,(%1"2%$#32%6'**%6#1",)1%3,,/7%9*)$"%6#1"%1"2%@F`%,(%1"2%8'+N%6'**4%=($1'**%'%@F`G B@E%9*)$"%6#1"%1"2%@F`%,(%1"2%9/,(1%6'**4%?)1%*2(01"%1,%9#14%5$2%BA3%$#(N2/$%1,%$2+)/2%1"2%1#2%-*'12$ 1,%9/,(1%'(3%8'+N%6'**$%'(3%'*,(0%*2(01"4 @4 :2-2'1%1,%#($1'**%@F`$%,(%1"2%$#32%6'**%6#1"%3,,/4 i4 ?)1%X@Y%16,%B@E%*,(0%@F`$%1,%9#1%821622(%$#32%6'**%1#2%-*'12$%'(3%#($1'**%,(%9/,(1%'(3%8'+N%6'**$4 Cut 2x4-12' to Fit 2x4-8' Tie Plate Cut 2x4-12' to Fit Back Wall 2x4-8' Tie Plate Step 9 Install Metal 2x4 Joist Hangers 2x4 Gauge Block =($1'**%XBCY%2#0"122(%@F`%b,#$1%"'(02/$%'*#0(23%6#1"...
Page 12
Step 10 Install Loft Floor Important: Before securing the 2x4 floor joists make sure the side walls are plumb. The building width should be 12'-0" measuring from the outside of the 2x4 tie plates. ?)1%X_Y%(#(2%@F`GB@E%8,'/3$%1,%'%*2(01"%,9%Bifd%'(3%#($1'**%#( 1"2%&21'*%"'(02/$4%5$2%BGBh@d%"'(02/%('#*$4 Step 11A Install Loft Floor Sheathing Before installing floor sheathing consider where to locate the 2' x 4' access opening.
Page 13
Step 11B Install Loft Floor Sheathing continued B4 U,+'12%X`Y%9,)/%iGBh@d%F%@`d%R<;%9#**2/$4%=($1'**%'1%9/,(1%'(3%8'+N%+,/(2/$%,(%1,-%,9%@F`%1#2 -*'12$4%5$2%X`Y%9,)/%W3%+,&&,(%('#*$%2'+"4%=($)/2%1"2%$-'+2%821622(%9#**2/$%#$%_Wd4 @4 =($1'**%*,91%9*,,/#(0%821622(%R<;%9#**2/$4%M302%,9%$"2'1"#(0%$",)*3%82%9*)$"%6#1"%9/,(1%'(3%8'+N 6'**%1#2%-*'12$4%:292/%1,%1"2%$)002$123%*'.,)1%,(%-/2V#,)$%-'024%=($1'**%9*,,/#(0%)$#(0%W3%+,&&,( ('#*$%$-'+23%B@d%'-'/14 Back 96" Between OSB Fillers Side Wall Wall IMPORTANT: Do not place heavy weight on loft 3-1/2" x 24" OSB Filler at this point. Step 12 Install Corner Trim IMPORTANT: Lower Trim Must Be Installed Before Installing Roof Gables! B4 U,+'12%XiY%1"/22%@d%F%`CGih`d%9#**2/%$1/#-$4%['#*%1"2$2%,(%1,-%,9%1"2%$#3#(0%,(%1"2%8'+N%6'**4...
Page 14
Step 13A Assemble Gables B4 Z'1"2/%-/2G8)#*1%0'8*2%2(3%9/'&2$7%XBY%,(2%*291%'(3%XBY%/#0"17%XBY%,(2%`_GBh@d%*,(0%@F`%'(3%X@Y 16,%i@GBh@d%*,(0%@F`$%6#1"%'(0*23%2(3$4 @4 L,$#1#,(%1"2$2%+,&-,(2(1$%1,021"2/%'$%$",6(%82*,64%]"2(%'*#0(23%+,//2+1*.%1"2%8,11,&%@F`$ 6#**%82%$1/'#0"1%'(3%&2'$)/2%B@EGAd%9/,&%2(3%1,%2(34%Pre-built gable ends highlighted in gray. i4 !2&-,/'/#*.%1'+N%BF`%8*,+N$%1,%*,91%9*,,/#(0%'/,)(3%1"2%9/'&2%&2&82/$4%!"2$2%8*,+N$%6#**%82 CdGB@d%*,(0%'(3%&'.%"'V2%'(0*23%2(3$4%H'N2%$)/2%X@Y%16,%,9%1"2$2%8*,+N$%'/2%-,$#1#,(23%#($#32 2'+"%-/2G8)#*1%0'8*2%2(3%9/'&2%'$%$",6(4%L,$#1#,(%1"2%/2$1%,9%1"2%8*,+N$%'--/,-/#'12*.%$-'+23 1,%",*3%@F`$%#(%-*'+24%!"2$2%6#**%#($)/2%1"'1%'**%1/)$$2$%'(3%0'8*2$%'/2%8)#*1%2F'+1*.%1"2%$'&24 TR%[R!%('#*%8*,+N$%1,%0'8*24 `4 <2+)/2%1"2%8,11,&%@F`%1,%1"2%0'8*2%$1)3%)$#(0%X@Y%16,%@GBh@d%$+/26$4 K4 U,+'12%X@Y%16,%KGih`dFB`d%R<;%0)$$21$4%J11'+"%1"2$2%1,%1,-%,9%2'+"%0'8*2%$1)3%1,%$2+)/2%9/'&2 1,%i@GBh@d%@F`$4%5$2%W3%+,&&,(%('#*$4%<22%T21'#*%EJE4 5-3/4"x14" Gusset Detail 'A' Temporary 1x4 blocks Gable Stud Right Pre-built Gable Frame 32-1/2" Long 2x4s 1x4 Block MUST be Positioned Here and Another on...
Page 16
Step 14B Install Gable Siding continued i4 =($1'**%+2(12/%$#3#(0%-'(2*4%U,+'12%$)(8)/$1%6#(3,67%packed in dormer carton7%'(3%+)1%,)1 $#3#(0%'++,/3#(0%1,%6#(3,6%#($1/)+1#,($4%=1%#$%'3V#$'8*2%1,%#($1'**%1"2%6#(3,6%'912/%0'8*2%#$%$214 `4 =($1'**%*'$1%$#3#(0%-'(2*4 Step 15 Install Gable Overhang B4 U,+'12%X@Y%16,%ffGihCd%*,(0%@F`%/'912/$%,(%0'8*24%=($1'**%@F`$%9*)$"%6#1"%1"2%1,-%,9%0'8*2 9/'&24%5$2%BA3%$#(N2/$4 @4 U,+'12%X@Y%16,%iAGBh`d%*,(0%@F`%/'912/$%'(3%#($1'**%1,%9#(#$"4%@F`$%6#**%2F12(3%82.,(3%2(3%,9 0'8*24 Do not remove the temporary 1x4 blocks until the roof trusses and back gable are assembled. 77-3/8"...
Page 17
Step 16 Set Front Gable Important: Temporarily brace the gables with 2x4s to secure gables until the roof sheathing is installed! B4 =($1'**%0'8*2%,(%1"2%9/,(1%6'**4%<2+)/2%8,11,&%,9 0'8*2%1,%*,91%9*,,/%'(3%R<;%9#**2/$%)$#(0%BA3%$#(N2/$4 @4 ['#*%1"2%8,11,&%2302%,9%1"2%$#3#(0%#(1,%1"2%BF`%1/#&4 5$2%W3%0'*V4%('#*$4 Bottom edge of gable siding extends over 1x4 trim Front Wall Step 17 Assemble Rear Gable :2-2'1%<12-$%Bi%1"/,)0"%BW%1,%'$$2&8*2%'(3%$21%/2'/%0'8*24 Step 18...
Page 18
Step 19 Set Trusses B4 <1'/1#(0%'1%8'+N%0'8*2%$21%'%1/)$$%8.%$*#3#(0%2(3$%,V2/%@F`%9*,,/%b,#$14%!/)$$%2(3$%$",)*3%$21%9*'1 '1,-%9*,,/%b,#$14%<2+)/2%6#1"%XBAY%12(%W3%+,&&,(%('#*$%,(%8,1"%$#32$4 @4 ?,(1#()2%$1'(3#(0%1/)$$2$%1,%9/,(1%,9%8)#*3#(04 H'N2%$)/2%1/)$$2$%'(3%0'8*2$%'/2%-*)&84%=9 (2+2$$'/.%$-'(%'%@F`%'+/,$$%1,-$%'(3%1'+N%1, N22-%-*)&8%)(1#*%/,,9%$"2'1"#(0%#$%#($1'**234 Step 20 Install Sidewall Trim It's easier to install the soffit if the corner and sidewall trim are installed first. This enables the soffit to rest on the trim where it meets the building. See lower detail. B4 U,+'12%'%ihCd%F%id%F%Cd%$#3#(0%0')02%8*,+N%-'+N23 #(%1"2%"'/36'/2%8'04%L*'+2%1"#$%0')02%8*,+N%)(32/ 1"2%@F`%,V2/"'(0%'(3%8)11%'%__d%*,(0%BF`%1/#&...
Page 19
Step 21 Install Soffit B4 U,+'12%'%_Gih`d%F%`Cd%$,99#1%-'(2*4%H2'$)/2%9/,&%+2(12/%,9%9#/$1%1/)$$%1,%9'+2%,9%1"2%@F`%#($1'**23 ,(%1"2%9/,(1%0'8*24%H'/N%1"#$%*2(01"%9/,&%1,(0)2%2302%$#32%+)1%,99%EUJLE%2302%2(3%,9%-'(2*4 @4 ['#*%1"2%$,99#1%-'(2*%1,%1"2%2(3%,9%1"2%@F`$4%<22%Detail 'C'%82*,64 i4 =($1'**%XKY%9#V2%_Gih`d%F%`Cd%$,99#1%-'(2*$%'*,(0%1"2%$#32%,9%1"2%8)#*3#(0%+)11#(0%1"2%*'$1%$,99#1 -'(2*%9*)$"%6#1"%1"2%@F`%,(%1"2%/2'/%0'8*24 `4 :2-2'1%1,%#($1'**%$,99#1%-'(2*$%,(%1"2%,--,$#12%$#32%6'**4 Tongue Edge at Center of Truss LAP Edge is cut off Detail 'C' Soffit 1x3 - 72" Trim Board Nail Soffit to End of 2x4...
Page 20
Step 22 Install 1x6 Fascia on Side Walls B4 <1'/1#(0%'1%1"2%8'+N%0'8*27%#($1'**%'%fKd%*,(0%BFW%1/#&%8,'/3%9*)$"%6#1"%1"2%9'+2%,9%1"2%@F`4 =($1'**%1"2%BFW%8,'/3%$,%1"2%1,-%,9%1"2%8,'/3%#$%'*#0(23%6#1"%1"2%1,-%,9%1"2%1/)$$2$4%!"2%/,,9 $"2'1"#(07%installed later7%$",)*3%/2$1%,(%1"2%9'$+#'4%5$2%'%$1/'#0"1%2302%'$%$",6(%82*,64%5$2 W3%0'*V4%('#*$4 @4 =($1'**%XiY%1"/22%BFWGWE%1/#&%8,'/3$%(2F14 i4 ?)1%'%`Cd%*,(0%BFW%1/#&%8,'/3%9*)$"%6#1"%1"2 ,)1$#32%@F`%,(%1"2%9/,(1%0'8*24 `4 :2-2'1%,(%,--,$#12%$#32%6'**4 Flush with 2x4 Straight Edge Soffit Step 23A Install Roof Sheathing B4 U,+'12%X@Y%`CdF%_Wd%$"221$%,9%R<;4%?)1%9/,&%1"2$2%X@Y%16,%`CdF%KBd%$"221$4%I/,&%3/,-$%+)1 X@Y%16,%`CdF%@fd%$"221$4 @4 U,+'12%X@Y%`CdF_Wd%$"221$%,9%R<;4%?)1%1"2$2%#(%"'*9%1,%&'N2%X`Y%9,)/%`CdF`Cd%$"221$4 i4 ;29,/2%#($1'**#(0%/,,9%$"2'1"#(0%&'N2%$)/2%1"2%1/)$$2$%'(3%0'8*2$%'/2%-*)&84%<1'/1#(0%'1%1"2 /2'/%0'8*2%#($1'**%$"2'1"#(0%-2/%1"2%*'.,)1%,(%1"2%(2F1%-'024%<2+)/2%$"2'1"#(0%6#1"%W3%+,&&,( ('#*$4%<-'+2%('#*$%B@d%'-'/14 OSB Flush with 2x4 The top row of sheathing will allow...
Page 21
Step 23B Install Roof Sheathing continued `4 ]"2(%#($1'**#(0%$"221$%'1%9/,(1%0'8*2%+)1%9*)$"%6#1"%1"2%@F`$%,(%1"2%0'8*24 K4 =($2/1%X@Y%16,%-*.G+*#-$%#(1,%1"2%/,,9%$"2'1"#(0%821622(%2'+"%1/)$$%'1%1"2%1,-%/,67 $22%3/'6#(0%82*,64 W4 ?)1%'%K_GBh`d%-#2+2%,(%1,-%/,6%$,%1,%82%9*)$"%6#1"%9/,(1%0'8*2%@F`$4 f4 T212/&#(2%*,+'1#,(%9,/%3,/&2/$%'(3%9,**,6%#($1/)+1#,($%#(%3,/&2/%N#14 Insert (2) two ply-clips into the roof sheathing between each truss at the top row Plyclip Cut 59-1/4" to fit 51" 48" x 27" Cut From 48"...
Page 22
Step 24 Install Door Flashing 3-1/2"x5" Flashing B4 U,+'12%X@Y%16,%iGBh@d%F%Kd%&21'*%9*'$"#(0 '(3%82(3%'*,(0%6#31"%1,%_A%320/22$4%=($1'** '1%2'+"%+,/(2/%,9%1"2%3,,/%,-2(#(04%!"2$2 6#**%82%+,V2/23%#(%1"2%(2F1%$12-$4 @4 =($1'**%1"2%0'*V4%3,,/%$#**%,V2/%9*'$"#(0%#( 1"2%+2(12/%,9%1"2%3,,/%,-2(#(04%5$2%BGBh`d -'(%"2'3%$+/26$%'*,(0%1"2%9/,(1%23024 Galv. Sill Step 25 Install Front Gable Trim and Door Trim B4 R(%9/,(1%0'8*2%#($1'**%X@Y%16,%BFW%1/#&%8,'/3$%,V2/%1"2%@F`%8,'/3$7%9*)$"%6#1"%1"2%1,-%,9 1"2%R<;%/,,9%$"2'1"#(04%5$2%W3%0'*V4%('#*$4 @4 =($1'**%0'8*2%1/#&%,(%1"2%/2'/%0'8*24 1x6 Gable Trim i4 =($1'**%'%iGfhCd%F%f@d -/#&23%b'&8%&'12/#'*%,( 1"2%1,-%,9%1"2%3,,/%,-2(#(07 9*)$"%6#1"%1"2%9/,(1%6'** $#3#(04%5$2%W3%0'*V4%('#*$4 `4 U,+'12%X@Y%16,%iGfhCd%F%f_GKhCd%-/#&23 b'&8%&'12/#'*%'(3%#($1'**%,(%1"2%$#32$%,9...
Page 23
Step 26 Install Pocket Doors Track B4 =($1'**%'%f@d%*,(0%!/'+N%<)--,/1%J$$2&8*.%C@Gih`d%9/,&%1"2%9*,,/4%ImportantS%&2'$)/2%9/,& 1"2%8,11,&%,9%1"2%@Fi%,(%1"2%$)--,/1%'$$2&8*.%1,%1"2%9*,,/4%=($)/2%1"2%(,1+"23%2(3%,9%1/'+N%#$ +2(12/%,9%3,,/%,-2(#(04%5$2%@GBh@d%$+/26$4 2x3 Track Support Assembly 2x8 Door Header View From Inside 82-3/4" to Floor @4 =($1'**%1"2%,1"2/%1/'+N%$)--,/1%'$$2&8*.4 Galv. Sill View From Inside K4 =($1'**%1"2%1/2'123%3,,/%$#**%82"#(3%1"2%3,,/ ,-2(#(04%!"2/2%(223$%1,%82%'%$-'+2%821622(%1"2 Screw Used 1/2'123%$#**%'(3%1"2%#($#32%6'**4%!,%-,$#1#,(%1"2 as Spacer $#**7%#($2/1%'%@GBh@d%$+/26%821622(%1"2%1/2'123 $#**%'(3%1"2%#($#32%6'**%'$%'%$-'+2/4%<+/26%1"2 $#**%1,%1"2%9*,,/%6#1"%XWY%$#F%@GBh@d%*,(0%$+/26$4 Treated Sill :2&,V2%1"2%$+/26%)$23%'$%'%$-'+2/4...
Need help?