Indoor Unit Installation - LG MULTI V VJ Series Installation Manual

Indoor unit, ceiling suspended convertable
Hide thumbs Also See for MULTI V VJ Series:
Table of Contents

Advertisement

Indoor unit installation

Hang the Indoor unit on suspension bolt as per following guidelines:
1. Lift the indoor unit to sufficient height.
2. Insert the suspended part of four suspension bolt in the four hangers provided on the side of main body one
by one.
3. Lower the indoor unit till the hangers rest on their respective flat washer.
4. Adjust the level in the top down direction by adjusting the suspension bolts.
Inclined the indoor unit as per direction provided in the fig
: Installation Information For Declination
1. Install declination of the indoor unit is very important for the drain of the convertible
type air conditioner.
2. Minimum thickness of the insulation for the connecting pipe shall be 10mm.
3. If the Installation Plates are fixed to horizontal line, the indoor unit after installing will
be declined to the bottomside.
• The unit must be horizontal or inclined at angle.
• The inclination should be less than or equal to 1° or in between 10 to 20mm inclined in drain direction as
shown in fig.
• The unit must be declined to the bottomside of the unit when finished installation.
Front of view
Ceiling
Side of view
Ceiling
5~10mm
10~20mm
Installation Manual 9
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi v arnu18gvja1

Table of Contents