Hide thumbs Also See for DAKOTA:

Advertisement

Quick Links

Read directions completely before beginning assembly.
www.growerslearning.com, click on How to Assemble under categories. In this section you will find video tutorials
to assist you with the assembly of your new greenhouse. If you have ANY questions please give us a call at
866-928-3390.
Step 1 – Ground Stakes
Square the corner stakes with each other. Take all
measurements on the outer edge of pipe.
Drive Corner stakes 18 inches in ground and then drive rest of
4 ft. centers
stakes
NOTE:
Use a large bolt and washer, or 2 x 4 on top of stakes to drive
them into the ground.
Step 2 – Bow Assembly
Place bow sections on flat ground.
Slide sections together (Fig 2.1), and secure at joints with self-
tapping screws that are provided (Fig 2.2).
Measure up each end of bow 6 inches and make a reference
mark. The mark is how far the bow slides into the ground stake.
Each bow is 7 pieces total; 3 angular, 2 side wall uprights, and 2
gable pieces.
GrowersSolution.com
DAKOTA GREENHOUSE INSTALLATION
!!!! CAUTION: Tubing ends may be sharp!!!
(Fig 1.1).
931.528.3390
We recommend that you visit The Learning Center at
Page 1 of 4
Fig 1.1 Ground Stakes
Fig. 2.1
Fig 2.2 Bow Assembly

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAKOTA and is the answer not in the manual?

Questions and answers

Summary of Contents for Growers SOLUTION DAKOTA

  • Page 1 GrowersSolution.com 931.528.3390 DAKOTA GREENHOUSE INSTALLATION !!!! CAUTION: Tubing ends may be sharp!!! Read directions completely before beginning assembly. We recommend that you visit The Learning Center at www.growerslearning.com, click on How to Assemble under categories. In this section you will find video tutorials to assist you with the assembly of your new greenhouse.
  • Page 2 (Fig 4.1) using a 2-hole strap (Fig 4.3). The purlin clamps are used on the remaining bows (Fig 4.4). Trim extra pipe off. The Dakota House has 3 runs of purlin. One at the center of bow inside of the house (Fig 4.1), one on each sidewall at top of upright inside of the house (Fig 4.2).
  • Page 3 Step 6 – End Walls NOTE: End walls are set up for a 36 inch storm door (not provided). The rough in for a 36 inch storm door is normally 36 ½ inches.  On front end-wall, measure to find the center of the house. ...
  • Page 4 time to install it on the base board or hip board. If you do not have Roll-Up Sides install wire base on the base board the length of your house. If you have Roll-Up Sides run the wire base on your hip board the length of the house.

Table of Contents