Download Print this page

EUFAB JAMES Operating Instructions Manual page 11

Bicycle rack for trailer tow bar
Hide thumbs Also See for JAMES:

Advertisement

Available languages

Available languages

Mounting the wheel rails
4 x Wheel rails halves
2 x Strap guide
2 x Link screw M6 x 25
4 x Wheel stopper
2 x Connecting element with metal loop
4 x Tensioning strap, small
Place the 4 rail halves in front of you as shown on the pictures below, and guide the components in the
sequence shown under the rail into the existing link.
Rail 1, left half:
Rail 1, right half
Rail 2, left half
Rail 2, right half
Pull one tensioning strap through each wheel stopper. Now insert one wheel stopper in
each wheel rail into the topmost link.
Make sure that the wheel stopper can be pushed from the inside to the outside towards
the wheel.
Connect the right and left halves of rail 1 with a rail connector.
Insert the connecting element from the top with the threaded bolt in the drilled holes of
the wheel rail. From below, insert the metal loop with the ridges facing outwards, over the threaded bolt and
screw firmly with two washers 11.9 x 6.5 x 0.9 and two wing buts.
Repeat this assembly process for rail 2.
4 x Link screw M6 x 75
4 x Washer
11.9 x 6.5 x 0.9
2 x Rail connector
4 x Wing nut M6

Advertisement

loading

This manual is also suitable for:

11417