2.1 Initial/Pre-Field Settings

Once the machine has been fully assembled and before
the machine is folded for transport check to ensure that
all hardware has been properly tightened to specifications
noted. Check to ensure that there are no loose parts or
tools anywhere on the machine.

2.2 Connecting the Implement

WARNING: Never allow anyone between
the tractor and implement when connecting
or disconnecting the implement until the
implement is completely supported by the
tractor, the engine is stopped and the park
brake is applied.
Attach the machine to the tractor that will be used with the
machine. See specifications section for tractor require-
ments.
STEP 1.
Use the hitch jack (1) on the front hitch of the machine
to adjust the height of the hitch (2). Align the hitch on the
tractor with the hitch on the machine. Install the hitch pin
through the holes in the tractor draw bar and the machine
hitch.
IMPORTANT: Be sure the pin mechanical lock device
is in place. The device may be a pin lock plate as
shown or a cross pin on the drop pin.
STEP 2.
Retract the hitch jack. Move the hitch jack to the storage
position and fasten with a pin.
STEP 3.
Install the safety chain (1) as shown.
IMPORTANT: Be sure the safety chain lock (2) is
secured.