S19-210HFP Installation WARNING Read this installation manual completely to ensure proper installation, then file it Installation with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Installation S19-210HFP Installation Step 1: Prepare foundation 1. Excavate a hole for the drain and inlet to a depth of 6" (152mm) minimum below the 17" frost line. (Standard depths: 18", 3', 4', 5' (432mm) or 6') . Ø 10¾"...
S19-210HFP Installation Assembly of Components NOTE: Items 6.1–6.8 come preassembled as Item 6. Item 5 comes preassembled. Flow control this end See exploded view on page 5 P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA TEL: 1-800-BRADLEY FAX: (262-251-5817) http://www.bradleycorp.com...
Page 5
Installation S19-210HFP Assembly of Components 8/12/09 netzerotools.com...
S19-210HFP Installation Parts List Item Part No. Description Item Part No. Description 131-042 Base 5.11 132-011 Retainer 113-006NE Pipe 1¼" NPT x 32½" 5.12 118-246 Valve Body Assembly 113-006LG Close Nipple ½" NPT 5.13 160-138 Machine Screw 169-726 Union ½"...
Need help?
Do you have a question about the S19-210HFP and is the answer not in the manual?
Questions and answers