TCS Ubiquity QD2040b Product Manual

TCS Ubiquity QD2040b Product Manual

Ubiquity cloud site gateway
Hide thumbs Also See for Ubiquity QD2040b:

Advertisement

Quick Links

QD2040b
Ubiquity Cloud Site Gateway
2800 Laura Lane • Madison, WI 53562 | 800.836.9044 • fax: 608.836.9044 | www.tcsbasys.com
|
PRODUCT MANUAL
The QD2040b Ubiquity Cloud Site Gateway
connects the site controller network with the
Ubiquity Cloud™ server.
Rev:0617

Advertisement

Table of Contents
loading

Summary of Contents for TCS Ubiquity QD2040b

  • Page 1 PRODUCT MANUAL QD2040b The QD2040b Ubiquity Cloud Site Gateway connects the site controller network with the Ubiquity Cloud™ server. Ubiquity Cloud Site Gateway 2800 Laura Lane • Madison, WI 53562 | 800.836.9044 • fax: 608.836.9044 | www.tcsbasys.com Rev:0617...
  • Page 2: Table Of Contents

    • Site gateway to Ubiquity Cloud: enables controller’s interoperability with Ubiquity Cloud • Enables Ubiquity Cloud to maintain controller programing and scheduling • Compatible with all TCS Basys supported controllers • Controller protocols supported: TCSbus and Modbus • Supervisory control routines •...
  • Page 3: Mounting

    COM 1-2: Connect an RS-485 Network (Refer to RS-485 Controller Network Wiring & Setup below) USB PORT 1-4: Connect an RS-485 Network via a USB to RS-485 converter (QD1010), or connect a TCS ZigBee network via a wireless gateway (QW1010) . Refer to RS-485 Controller Network Wiring & Setup below .
  • Page 4 0 to 255, excluding 248 . On controllers with displays, this can either be done from the face of the controller using the keypad and display, or using TCS Insight software, or by calling TCS Technical Support .
  • Page 5: Gateway Configuration Page

    . You can also adjust the Time-Out Period for each port . TCS recommends 250ms for wired networks and 1000ms for all wireless networks . 2800 Laura Lane • Madison, WI 53562 | 800.288.9383 • fax: 608.836.9044 | www.tcsbasys.com...
  • Page 6 USB flash drive or installation and connecting to the local network . TCS Technical Support access to the QD2040b if it is online with Ubiquity central server to “unlock” it . Communications Options: The QD2040b supports...
  • Page 7: Commissioning Tools

    Clicking the green button with the arrow on it on the please contact TCS Basys Controls to assign or initialize right side of the Controller View title bar will refresh the QD2040b to a site each controller's status .
  • Page 8: Checkout And Troubleshooting

    CHECKOUT & TROUBLESHOOTING Checkout & Troubleshooting CHECKOUT 1 . Be sure to check and verify all wiring before powering the QD2040b . 2 . Apply power . The Power LED will turn on . 3 . If the QD2040b has not been pre-programmed, it can be programmed at this time . 4 .

Table of Contents