Installation; Burner Equipment Supplied With The Kit; Disassembly Of The Burner From The Boiler - Riello RL 28/M Installation, Use And Maintenance Instructions

Kit for long combustion head
Table of Contents

Advertisement

Available languages

Available languages

2

Installation

2.1

Burner equipment supplied with the kit

Nozzle holder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Spacer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Pediment extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Shutter tie-rod. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Flame funnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Plastic plug . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
2.2

Disassembly of the burner from the boiler

Turn off the burner's electrical supply using the
main system switch.
DANGER
Turn off the fuel interception tap.
DANGER
Wait for the components in contact with heat
sources to cool down completely.
To install the long head kit it is necessary to disassemble the burner
from the boiler.
Place the burner on the ground and proceed with replacing the flame
funnel and the shutter tie-rod as explained below:
➤ unscrew the two screws 1)(Fig. 2) and remove the flame funnel
8);
➤ remove the cover of the burner;
➤ unscrew the two screws 2)(Fig. 3) and the screw 3) to remove
the interface assembly;
➤ unscrew the screws and nuts 4) and take out the shutter 9);
➤ remove the two screws 5) and remove the cover 6);
➤ remove the spindle 7) and remove the tie-rod 8);
➤ at this point install the tie-rod supplied with the kit, and fix it to
the spindle 7).
➤ Put back the shutter 9) fixing it using the screws and nuts 2);
➤ position the flame funnel 8) supplied;
➤ put back the interface assembly on the burner with the two
screws 2) and the screws 3);
➤ fix the burner on the boiler.
Installation
3
5
6
7
8
3
Spindle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Plate for extensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
M4x25 Screw . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Washers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 4
M4x8 Screw . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 4
M5x6 Screw . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Gasket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
At this point it is necessary to open the burner to extract the combus-
tion head, as described in the paragraph "Access to head internal
part".
20119851
1
4
2
9
20119856
GB
1
8
20119855
Fig. 1
Fig. 2
Fig. 3
2915445

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Rl 38/mRl 50/m301012030101213010122

Table of Contents