Installation; Selection Of The Best Location - LG MULTI V ARNU363NJA4.AMBBLUS Installation Manual

Vertical air handling unit
Hide thumbs Also See for MULTI V ARNU363NJA4.AMBBLUS:
Table of Contents

Advertisement

Installation

Selection of the best location

• Where optimum air distribution can be ensured.
• Where nothing blocks air passage and install the duct work.
• Where condensate can be properly drained.
• Where the ceiling is strong enough to bear the indoor unit weight.
• Where the false ceiling is not noticeably on an incline.
• Where sufficient clearance for maintenance and service can be ensured.
• Where piping between indoor and outdoor units is possible within the allowable limit. Refer to the
installation manual for the outdoor unit.
• Vertical Air Handling Unit can be installed for upflow and horizontal-left positions.
More than
350(13-25/32)
More than
600(23-5/8)
clearance from
access panels
for Service
More than
350(11-25/32)
NOTE : The primary and secondary drain line must be trapped to allow proper drainage of condensate
water, If the secondary drain line is not used, it must be capped.
In the case of sea coast installation, salt residue may cause corrosion of cabinet and component
parts. Please take appropriate anti-corrosion measures.
More than
250(9-27/32)
Installation
More than
250(9-27/32)
Unit: mm (inch)
Installation Manual 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents