Installation

Upflow Installation

• Position unit for plenum installation.
• The plenum should be secured in order to support the installation of adapter callers accommodate the
installation of any duct work.
• Seal all duct work according to local codes to prevent air leakage. Ensure that filter access is unob-
structed.
• The air handler support platform should be sturdy enough to support the cabinet plus any accessory
components including filter box.
• The minimum height clearance is 14inches(350mm) to maintain proper air flow.
• Vibration isolators (purchased locally) must be placed between the unit and the pedestal.
• An illustration showing an example of where a vibration isolator should be added would clarify what
the installing contractor should do to properly position the isolator.
Do not connect the screws on Front and Rear side, it may cause the filter can not be mounted.
10 Vertical Air Handling Unit
Field Supplied
Supply Duct
Field
Supplied Return
Plenum
More than 6 screws (M4*25L)
More than
1inch (25mm)