TABLE OF CONTENTS
Installation Requirements
Features.....................................4
Unit .........................................13
methods..................................15
Flow........................................30
capacity ..................................31
Vertical Air Handling Unit Installation Manual
Required Parts
o Four type "A" screws
o Pipes: Gas side
Liquid side (Refer to
Product Data)
o Insulation materials
o Additional drain pipe
Required Tools
o Level gauge
o Screw driver
o Electric drill
o Hole core drill
o Hexagonal wrench
o Gas-leak detector
o Vacuum pump
o Gauge manifold
o Owner's manual
o Thermometer
o Electric Heater installation
manual
Installation Manual 3