Wiring; General Guidelines; Connector Pin Assignment - Pilz PSEN opII4B Series Operating Manual

Table of Contents

Advertisement

PSEN opII4B Series

Wiring

General guidelines

}
Do not lay the connecting cable near or in contact with cables that carry high or highly
volatile currents.
}
Use separate cables to connect the wires to the OSSDs on different safety light curtains
or safety switches.
}
Do not connect contacts OSSD1 and OSSD2 in series or in parallel.
}
For supply voltage, use only PELV/SELV power supplies that have a voltage buffer in ac-
cordance with EN 60204-1.
}
The power supply must be able to bridge a short (20 ms) supply voltage failure in accord-
ance with EN 61496-1.
}
SELV power supply
– Do not connect the safety light curtain housing to the earth conductor or the protect-
}
Connection to PDP67
– Use the order reference of the cable listed (see
}
Connection to other evaluation devices
– Use the order reference of the cable listed (see
– The clamps for connection to the evaluation device must be kept in a locked control
}
Ensure compliance with permissible cable bending radii (see

Connector pin assignment

Transmitter and receiver electrical connections are made with M12 connectors. These con-
nectors are located on the bottom of the transmitters and receivers.
5-pin connector on the transmit-
ter
Operating Manual PSEN opII4B Series
1005005-EN-02
ive conductor. The transmitters and receivers must be electrically isolated from the
machine/system. The use of the flexible bracket (swivel mount) provides this electrical
isolation.
PDP67 [
55])
evaluation devices [
cabinet. This prevents unauthorised modifications.
2
3
5
4
55])
PIN
Assignment
1
uncoded: +24 VDC
A-coded: +24 V DC
B-coded: 0 V DC
1
2
Reserved
3
0 VDC
4
Reserved
5
uncoded: +24 VDC
A-coded: 0 V DC
B-coded: +24 V DC
Accessories, connection to
Accessories, connection to other
Technical details [
Cable colour
brown
white
blue
black
grey
43]).
| 29

Advertisement

Table of Contents
loading

Table of Contents