Step 4 – Hang your projector screen
You'll need
Hanging bracket A (2)
Bakelite screws (6)
Align one of the hanging brackets A on the wall where you want to install the
1
top of your projector screen. Make sure that the top of the bracket is level on
the wall.
Drill pilot holes through the screw holes on the bracket and into the wall with
2
a drill with an 8 mm bit.
Insert a plastic anchor into each screw hole you drilled. Make sure that the
3
anchor is flush with the wall. If needed, tap the anchors with a hammer or
mallet.
Secure the bracket to the wall with two of the Bakelite screws.
4
Install the other hanging bracket A. Make sure that the tops of both brackets
5
are level with each other.
Hang the top of the your projector screen on the A brackets.
6
Hanging bracket B (2)
Hammer or mallet
Plastic anchors (6)
The distance between the hanging brackets A should be
100 in. model: More that 4.8 (1.45 m) and less than 5.9 ft. (1.8 m).
120 in. model: More than 5.7 ft. (1.75 m) and less than 6.6 ft. (2 m).
1.2 in.
(3 cm)
www.insigniaproducts.com
Pencil
Phillips screwdriver
Projector Screen
Drill with 8 mm bit
9