Page 1
Shelby Storage Bed TWIN / FULL / QUEEN ASSEMBLY INSTRUCTION Important safety instructions: • Please read all instruction carefully before assembling this desk. • For your safety, assembly by two or more adults is strongly recommended. • Keep these instructions for future use.
R – Shelf P – Leveler S – Dowel head screw Screw Support Peg 8x15mm 5x13x16x1.5mm Ø 10x25mm 8 x 17mm 3/8”x109x30mm 24pcs 6pcs 16pcs 16pcs 8pcs TOOLS REQUIRED (but not included): Phillip Head Screwdriver Date: 2014-Sep-05 www.pbteen.com Page 2 of 6...
Page 3
2. Attach Left & Right HB Legs (C&D) to the Headboard (A) by inserting the Short Allen Bolt (K) with Spring Washer (L) and Flat Washer (M) through pre-drilled holes in the Legs (C&D) into the pre-drilled holes in Headboard Posts (A); tighten with Allen Key (I), as shown below. Date: 2014-Sep-05 www.pbteen.com Page 3 of 6...
Page 4
(B) as shown in the illustration below. Adjust Levelers of the Headboard (A) and Footboard (B) until they sit level with the Storage Side rail (F) as shown in illustration below. Figure 2 Date: 2014-Sep-05 www.pbteen.com Page 4 of 6...
Page 5
Storage Side rail (F). Gently rest the Shelf Panel (H) on top of the Shelf Support Peg (R) and place the Pan Head Screw (Q) underneath the Shelf Support Peg (R) hole; tighten it using the Philip Head Screwdriver as shown below. Date: 2014-Sep-05 www.pbteen.com Page 5 of 6...
Avoid direct sunlight and excessive temperatures. • Dust often using a clean, soft, dry and lint-free cloth. • Waxing is not recommended on lacquered finish. • Hardware should be checked periodically for tightness. Date: 2014-Sep-05 www.pbteen.com Page 6 of 6...