Download Print this page

Cisco ONS 15454 Unpacking And Installing page 28

Four-shelf and zero-shelf bay assembly
Hide thumbs Also See for ONS 15454:

Advertisement

Install the Power and Ground
Connect the Office Ground to the ONS 15454
Tools needed:
Step 1
Remove the lower backplane cover:
a.
b.
c.
Verify that the office ground cable (#0/1 AWG) is H-tapped into the #4 AWG and is connected to the
Step 2
top of the bay (as shown in
Attach one end of the shelf ground cable (#6 AWG) to the right side of the backplane ground nut. See
Step 3
Figure 26
Figure 26
Attach the other end of the shelf ground cable to the bay
Step 4
Unpacking and Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
28
#2 Phillips screw driver
H-tap
H-tap crimp tool
Wire cutters
Ground cable #4 AWG stranded
Unscrew the five retaining screws that hold the clear plastic cover in place.
Grasp the clear plastic cover on each side.
Gently pull the cover away from the backplane.
Figure 14 on page
for the location of the ground on the backplane.
Ground location on the backplane
FRAME GROUND
Attach #6 AWG
17) according to local site practice.
(Figure
27).
78-13271-05

Advertisement

loading