Cylinder Installation; Installation Sequence; Connecting The Equipotential Bonding - Viessmann VITOCELL 100-V Installation And Service Instructions Manual

Heating water buffer cylinder
Table of Contents

Advertisement

Cylinder installation

!
Please note
The thermal insulation must not come into con-
tact with naked flames.
Exercise caution when welding and brazing
!
Please note
To prevent material damage, install the buffer
cylinder in a draught-free room free from the risk
of frost.
Otherwise the buffer cylinder will have to be
drained if there is a risk of frost and it is not in
use.
Provide adequate clearance from the wall so that the
thermostat can be operated (if supplied).
Placing the cylinder on a plinth will make the room
easier to clean.
Level the buffer cylinder with its adjustable feet.
Cylinder incl. immersion heater
650
Fig. 5

Connecting the equipotential bonding

Connect the equipotential bonding in accordance with
the requirements stipulated by your local power supply
utility and VDE [or local] regulations.
Note
Only use one or two of the adjustable feet to level the
cylinder. At least one of the adjustable feet must
remain fully screwed in.
Fig. 4
Never extend the adjustable feet beyond a total length
of 35 mm.
Installation instructions, immersion heater
Note
Maintain the minimum clearance.
Note
The unheated length of any threaded immersion
heater installed on site must be at least 100 mm.
Cylinder capacity: 200 l.
Immersion heater output: 6 kW.
CH: Connect the equipotential bonding in accordance
with the requirements stipulated by your local power
supply utility and current SEV [or local] regulations.

Installation sequence

≤35
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitocell 100-wSvwa

Table of Contents