Summary of Contents for Wanner Engineering Vector 2000 Series
Page 1
Installation and Operation Manual VEC-991-2400E Pe r i s t alt i c Pu m p s Vector 2000 Series Models: 2002, 2003, 2004, 2005, 2006, 2007 W0453 W0454 Models: 2002, 2003, 2004 Models: 2005, 2006, 2007 1204 Chestnut Avenue, Minneapolis, MN...
1 – 3 ft/sec. Velocity = 0.408 x GPM Pipe ID This technical manual covers the Vector 2000 Series pumps. • Install a 3 ft. to 4 ft. flexible hose between pump and hard The manual provides instructions on how to install, start, and piping to absorb vibrations, expansions, or contractions.
Vector 2000 Series Installation Pump Test and Installation Before Initial Start-Up Before you install the pump in the system, set the direction of Before you pump fluid through the system, be sure that: pump rotation and the position of the pressure rollers: 1.
Vector 2000 Series Installation Routine Maintenance Periodically inspect hose for signs of failure caused by chemical DISCHARGE attack, material fatigue, etc. Check non-petroleum silicone lubricant on hose, and reapply if worn off. Inspect roller bearings for damage, and replace if necessary (See Parts List, item 11).
9. Spin each roller to determine integrity of the bearings. Replace roller and bearing assembly if either roller does not spin or either roller runs rough. United States Instant Information: www.vectorpump.com Wanner Engineering, Inc. (612) 332-5681 Fax (612) 332-6937 VEC-991-2400E...
Page 6
(Make sure compression is same for both rollers by measuring roller bracket in relation to rectangular rotor block). United States Instant Information: www.vectorpump.com Wanner Engineering, Inc. (612) 332-5681 Fax (612) 332-6937 VEC-991-2400E...
(where rollers contact hose). 7. Turn the rotor 180°. Reinstall the roller holder without shims. 8. Set roller pressure according to procedure following (steps 3 thru 7). United States Instant Information: www.vectorpump.com Wanner Engineering, Inc. (612) 332-5681 Fax (612) 332-6937 VEC-991-2400E...
Page 8
Opening Figure 12 5. Add same number of shims under other roller. 6. Test pump in full operation, and readjust as necessary. 7. Reattach front cover. United States Instant Information: www.vectorpump.com Wanner Engineering, Inc. (612) 332-5681 Fax (612) 332-6937 VEC-991-2400E...
Warranty Limited Warranty Use Of The Pump Wanner Engineering, Inc. (“Wanner”) extends to the original The pump was defined for specific application. Any other use purchaser of equipment supplied or manufactured by Wanner which does not comply with this use invalidates the warranty.