The green power status indicator on the front panel flashes to indicate that the system is in standby
Figure 15. Do not press the power button on the IBM Flex System Manager (FSM)
mode and is ready to be powered on.
3. Before you boot the nodes, read and then remove the blue attention label on each node.
4. Do not press the power button on the IBM Flex System Manager (FSM).
What to do next
After you connect the power cable, you must perform a verification check. For more information, see
"Performing a verification check."
Performing a verification check
Check to ensure that all of your hardware components are present and functioning properly.
Before you begin
Make sure that the following LEDs on the front of the system are lit:
v The IBM logo on the chassis front information panel.
v The power LED on the IBM Flex System Manager management node
Installing and configuring the system
15
Need help?
Do you have a question about the PureFlex System and is the answer not in the manual?