TRAMEX CME5 User Manual

TRAMEX CME5 User Manual

Concrete moisture encounter
Hide thumbs Also See for CME5:

Advertisement

Quick Links

CONCRETE
MOISTURE ENCOUNTER
-
-
CME5
USER GUIDE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CME5 and is the answer not in the manual?

Questions and answers

Summary of Contents for TRAMEX CME5

  • Page 1 CONCRETE MOISTURE ENCOUNTER CME5 USER GUIDE...
  • Page 2: Table Of Contents

    CONCRETE MOISTURE ENCOUNTER 5 USER GUIDE TABLE OF CONTENTS Introduction....................2 How it works..................3-4 Instrument Features..............5-7 Working With your Concrete Moisture Encounter 5..8 • Drying time for concrete floors and screeds.....8 • Pre-test conditioning and preparation......9 Operating Instructions............10-12 Limitations...................13 Calibration....................13 Warranty....................14 Warranty Claims ................15 Product...
  • Page 3: Introduction

    INTRODUCTION Hi there! Thank you for trusting our brand and choosing the Concrete Moisture Encounter CME5, from Tramex. It is our goal to ensure that you are always happy with what you bought from us, so please let us know if you have any questions and rest assured, we are always here to help.
  • Page 4: How It Works

    HOW IT WORKS The Concrete Moisture Encounter CME5 detects and evaluates the moisture conditions within the cementi- tious slab or screed by non-destructively measuring the electrical impedance, which varies in proportion to the moisture content in the material under test.
  • Page 5 By simply pressing the Concrete Moisture Encounter CME5 down on the surface in stra- tegically chosen locations, instant readings can be taken over a large area in the shortest possible time.
  • Page 6: Instrument Features

    CONCRETE MOISTURE ENCOUNTER 5 USER GUIDE INSTRUMENT FEATURES The instrument face with brief notes on the push button controls and LED indicators is shown below. 85mm 85mm 1 = Moving coil meter. 1 = Moving coil meter. 2 = Bluetooth ON LED 3 = Hold flashing LED.
  • Page 7 • Three simple push controls - On/Off; Hold; Bluetooth; with corresponding LED indicators. • The Concrete Moisture Encounter CME5 has three scales: Top Scale - Red - Concrete Moisture Content (MC%) readings for Concrete Slabs & Sand/Ce- ment screeds, 0 - 6 % moisture by mass/weight as per the oven dry/gravimetric method.
  • Page 8 The ON LED illuminates when the ON/OFF button is pressed and remains on until the Concrete Mois- ture Encounter CME5 automatically powers off. The Hold LED flashes when HOLD is selected. If the batteries are nearing end of life, all LEDs flash sequentially for 3 seconds at each power ON...
  • Page 9: Working With Your Concrete Moisture Encounter 5

    During the drying period and prior to applying the floor covering, the floor should be regularly checked to monitor moisture content with the Concrete Moisture Encounter CME5. - Back to Top -...
  • Page 10: Pre-Test Conditioning And Preparation

    CONCRETE MOISTURE ENCOUNTER 5 USER GUIDE Pre-test conditioning and preparation For best and most accurate results, to allow for an accurate reflection of the amount of moisture present and moisture movement in the slab during normal operating conditions: • Artificial heating or drying equipment should be turned off at least 96 hours before final readings are taken.
  • Page 11: Operating Instructions

    Bluetooth is turned on and the LED indicator illuminated. Your Concrete Mois- ture Encounter CME5 identifier will be the serial number that is found on the back of the meter. Press the Concrete Moisture Encounter CME5...
  • Page 12 The needle freezes on the analog dial. The HOLD LED light flashes slowly indicating HOLD is on. • If the Concrete Moisture Encounter CME5 is powered off while on HOLD, the frozen reading is digitally memorized and restored when powered on again.
  • Page 13 floor screeds. NOTE The Concrete Moisture Encounter CME5 is calibrated to give percentage moisture content readings on a clean, bare dust free concrete floor slab, therefore readings taken on concrete slabs through paint, coat-...
  • Page 14: Limitations

    Calibration Request. Calibration adjustments should not be carried out by anyone other than Tramex or their authorized service provider who will issue a calibration certificate on completion. Requirements for quality man- agement and validation procedures, such as ISO 9001, have increased the need for regulation and verification of...
  • Page 15: Warranty

    In no event shall Tramex, its agents or distributors be liable to the customer or any other person, company or organisation for any special, indirect, or consequential loss or damage of any type whatsoever (including, with- out limitation, loss of business, revenue, profits, data,...
  • Page 16: Warranty Claims

    Tramex Ltd. PRODUCT DEVELOPMENT It is the policy of Tramex to continually improve and update all its products. We therefore reserve the right to alter the specification or design of this instrument without prior notice.
  • Page 17: Safety

    CONCRETE MOISTURE ENCOUNTER 5 USER GUIDE SAFETY This Users Guide does not purport to address the safety concerns, if any, associated with this instrument or its use. It is the responsibility of the user of this instrument to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Table of Contents