4.1 Technical details: electrical connection – supply line
Electrical connection: supply line
1. Please open your wallb-e eco 2.0 to connect the supply line.
2. To wall mount your wallb-e eco 2.0 please use:
c) Please use the holes a), as seen in the picture below.
d) Alternatively use the pre-cut holes b)*, as seen in the picture below.
3. Please connect your supply line according to your wallb-e eco 2.0 variant. Use the
recommendations and instructions of chapter "4.1 Electrical connection- conditions
and 4.1 Technical Details: electrical connection – supply line"
4. Please note: You are free to choose any of the pre-cut holes to install the supply line
– use a screwdriver to remove the covers.
Electrical connection: 3,7kW to 22kW
Supply line
(Input
terminal X1)
brown or
black
blue
green
/yellow
The installation, connection and initial start-up must be performed by trained personnel
24
a. Please make sure to use the included sealing caps if you are using the
pre-cut holes (b) to maintain the protection class IP65. Not using the
sealing caps might lead to water entering the internal switch cabinet.
wallb-e eco
wallb-e eco 2.0
2.0 3,7kW
4,6kW
L1
L1
N
N
PE
PE
with corresponding abilities.
Petring Energietechnik GmbH – Paderborner Str. 76 – 33189 Schlangen
Tel: +49 5252 989440 Mail: inquiry@wallb-e.com
wallb-e eco 2.0
Supply line
7,4kW
(Input terminal
X1)
L1
brown
N
black
PE
grey
blue
green
/yellow
wallb-e eco 2.0
wallb-e eco
11kW
2.0 11kW
L1
L1
L2
L2
L3
L3
N
N
PE
PE

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Eco 2.0 4,6kwEco 2.0 7,4kwEco 2.0 11kwEco 2.0 22kw

Table of Contents