Each machine has already been tested at the factory and is delivered with initial settings
pre-programmed.
We recommend to wait for 15 minutes before initial operation so that the machine can reach
optimal operation temperature.
However, temperature differences can change the touch screen settings so that they are no
longer correct. Therefore, when a machine is put in operation for the first time, we recommend
to ALWAYS observe the following procedure:
1. Turn on the machine:
With the switch located on the back, the program starts automatically.
2. Open the front door and turn on the operator switch:
The Golden Island operator mode appears on the screen.
3. Calibration of the touch screen:
Tap "Basic settings", then "Calibration".
Sit in a perfectly straight way, well-centred position, at a 90° angle in front of the machine
and follow the instructions on the display exactly.
4. Setting the volume:
Under "Basic settings" you can adjust the volume for the game mode and the stand-by
mode by using the
5. Via the "Back" button you reach the test mode main menu, turn off the operator switch
and the game area is automatically restarted.
Page 8
Initial Operation
buttons.