BNT95 Series Valve Operation Manual
Calendar Clock Mode
Screen shows Current Time, Last Regeneration day, Regeneration Mode, the Remaining
Days of next regeneration, the Capacity Remaining of next regeneration and current Flow Rate.
Numbers of blue bar represent the Remaining Days at Calendar Clock mode.
Numbers of blue bar represent the Capacity Remaining, the Flow Rate at Meter Mode.
Screen will be locked if any button without being operated at the standby display.
4.System Initialization:
When power is first supplied, the valve may take about two minutes to initialize, and the valve
will show:
Meter Mode (Meter Immediate, Meter Delay,
Meter Override)
- 4 -