Canature BNT95 Series Operation Manual page 17

Table of Contents

Advertisement

BNT95 Series Valve Operation Manual
Replacing Drain Line Flow Control and Brine Line Flow Control
To replace the Drain Line Flow Control (DLFC):
• Remove the Clip
• Pull the Drainlet outward
• Pull the DLFC Holder outward from the Drainlet
• Replace the DLFC
To replace the Brain Line Flow Control (BLFC):
• Remove the Clip
• Pull the Brinelet outward
• Pull the BLFC Holder outward from the Brinelet
• Replace the BLFC
- 16 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents