GE Peristaltic Pump P-1 Operating Instructions Manual page 41

Table of Contents

Advertisement

Step
4
5
6
Assemble the tubing
Assemble the pump tubing by inserting one connector in each end of the tubing. The
distance between the nuts of the two connectors must be 140 mm. This length ensures
firm positioning of the tubing.
Insert the tubing
Follow the steps below to insert the tubing.
Step
1
2
3
4
Note:
Peristaltic Pump P-1 Operating Instructions 28962201 AF
Action
Place the fuse appropriate to your mains supply voltage in the fuse holder
and insert it into the right-hand position (step II in the illustration). The left
hand position is a holder for a spare fuse (included in the Mains Kit).
Remove the voltage selector switch, select the correct voltage, and replace
the switch with the correct voltage showing (step III in the illustration).
Note:
Select the 230 V position when using 220 V mains power.
Close the fuse/voltage selector cover and make sure the chosen voltage is
shown in the window.
Action
Open the lid.
Push back the pressure plate.
Insert the tubing. Make sure the nuts of the connectors fit correctly into their
housings.
Close the lid. The correct tubing pressure is set automatically.
When the pump is not in use, leave the lid open to prolong the life time of the
pump tubing.
140 mm
4 Installation
4.4 Assemble the product
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents