Function Board Installation
Prerequisite:
Connect the function board cable connector (colored side up) to the function board connector.
1.
Secure the protective tape covering the function board connector.
2.
Install the battery (see
3.
3-31
Battery Removal
on page
Figure 3:50. Connecting the Function Board Cable
Figure 3:51. Securing the Protective Tape
Battery Installation
3-37
on page 3-39).
Service and Maintenance