Function Board Installation
Prerequisite:
Connect the function board cable connector (colored side up) to the function board connector.
1.
Secure the protective tape covering the function board connector.
2.
Install the battery (see
3.
Service and Maintenance
on page
Battery Removal
Figure 3:56. Connecting the Function Board Cable
Figure 3:57. Securing the Protective Tape
Battery Installation
3-51
on page 3-54).
5-33