GE PVB94 Installation Instructions Manual page 9

Downdraft vent systems
Hide thumbs Also See for PVB94:
Table of Contents

Advertisement

PREPARE FOR DUCTWORK
Determine the best route for ductwork; it can be
routed in a variety of ways depending on the kitchen
layout.
IMPORTANT: The downdraft air discharge outlet
accordingly.
Typical duct arrangement countertop series.
To maximize the ventilation performance of the vent
system:
1. Minimize the duct run length and number of
transitions and elbows.
2. Maintain a constant duct size.
3. Seal all joints with duct tape to prevent any leaks.
• Install ductwork so the piece of duct nearest the
downdraft unit slots INTO the next piece of the duct.
Secure the joints with self-tapping screws and apply
duct tape around the joints to ensure an airtight seal.
Design Information
Optional duct arrangement under concrete slab.
PVC duct should be used if installing under a
poured concrete slab.
NOTE: PVC sewer pipe type PSM 12454-B
Schedule 40 ASTM D1785.
6" (15 cm)
Dia. 90°
Metal Elbow
Wall Cap
6" (15 cm) Dia.
Metal Duct
12"
16"
(30 cm)
(40.6 cm)
Max.
Min.
6"
(15 cm)
Dia. PVC
30'-0" (9.14 m) Max.
Coupling
6" (15 cm) Dia.
Pack tightly with gravel
PVC Sewer Pipe
or sand completely
Elbow
around pipe
9
Inside wall
cabinet
Up inside wall to roof or
overhang
Peninsula or island
Between floor joists
3-1/4" x 10" Rectangular
to 6" Round Transition
6" (15 cm)
Dia. Metal
Duct
Concrete
Slab
6" (15 cm)
Dia. PVC
Sewer Pipe
6"
(15 cm)
Dia.
PVC
Coupling
6" (15 cm)
Dia. PVC
Sewer
Pipe
6" (15 cm) Dia.
PVC Sewer Pipe
Elbow
Air
Flow
Screw
Outside wall
cabinet
Directly to outside
Peninsula
Through cabinet toe space
Duct Tape
Over Seam and Screw

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvb98Zvb30Zvb36

Table of Contents