Electrical Load Test Procedures - Garmin G1000 Checkout Procedure

Post installation checkout procedure hawker / beechcraft king air c90
Hide thumbs Also See for G1000:
Table of Contents

Advertisement

3.2

Electrical Load Test Procedures

CAUTION - De-icing heat elements will be energized during this procedure. Ensure aircraft is safe for the
application of anti-ice heat.
1. Using a 28 VDC ground power cart apply external power to the aircraft. Set BAT, EXT PWR and
AVIONICS MASTER switches to ON. Allow all aircraft systems to complete initialization and operate
for 15 minutes.
2. Set the clamp-on meter to read DC amps. Follow meter manufacture instructions to zero the amp-
meter. Place meter around the ground power cart DC power cable.
3. Make or verify the following switch selections: Switches not listed are not required.
EXT PWR – OFF
AVIONICS MASTER PWR – OFF
BAT – OFF
GEN 1 – OFF
GEN 2 - OFF
LEFT /RIGHT ENG AUTO IGNITION – OFF
BUS SENSE – NORM
GEN TIES – NORM
LEFT/RIGHT ENGINE ANTI-ICE – OFF
AUTOFEATHER – OFF
LEFT/RIGHT LANDING LIGHTS – OFF
TAXI LIGHTS – OFF
ICE LIGHTS – OFF
NAV LIGHTS – OFF
RECOG LIGHTS – OFF
PILOT WSHLD ANTI-ICE – OFF
COPILOT WSHLD ANTI-ICE – OFF
PROP ANTI-ICE – OFF
LEFT/RIGHT FUEL VENT ICE PROTECTION – OFF
SURFACE DEICE – OFF
STALL WARN ICE PROTECTION – OFF
LEFT/RIGHT PITOT ICE PROTECTION – OFF
BEACON LIGHTS – OFF
STROBE LIGHTS – OFF
TAIL FLOOD LIGHT – OFF
PROP SYNC – OFF (extended)
STANDBY BATTERY – OFF (extended)
CABIN BAR – OFF
G1000/GFC 700 Post Installation Checkout Procedure – Hawker / Beechcraft King Air C90
190-00682-00
Page 3-5
Revision 5