3 General Installation Guidelines

Tools and Materials

Safety and Preliminary Checks

E-Coder)R900i Installation and Maintenance Guide
This section describes tools, materials, and general installation information for the
E-Coder)R900i.
Table 1 shows the recommended tools you may need to successfully install the
E-Coder)R900i or to replace the MIU's internal battery.
Some items may not apply to your specific installation, or the list may not contain all required tools
or materials.
Item
Description/ Recommendation
Tool Kit
Contains standard tools including:
Flashlight
Observe the following safety and preliminary checks before and during each installation:
Verify that you are at the location specified on the Site Work Order.
Verify that the site is safe for you and your equipment.
Notify the customer of your presence, and tell the customer that you will need access
to the water meter.
If the Site Work Order does not have an MIU ID number on it, write in the ID num-
ber(s) of the MIU you are about to install. If the Site Work Order already has an MIU
ID number on it, verify that it matches the ID numbers on the MIU you are about to
install.
Table 1 Recommended Tools
Screwdrivers
Hammer
Pliers
Use
Various installation procedures
performed by the utility
Activate the LCD
5

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E-Coder)R900i and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents