Vulcan-Hart ERA Series Service Manual page 15

Electric fryers with kleenscreen plus filtration systems
Table of Contents

Advertisement

ERA & EBD SERIES ELECTRIC FRYERS - SERVICE PROCEDURES AND ADJUSTMENTS
3.
Lower heating elements to the down position.
4.
Loosen stop nut on all eye bolts.
5.
Adjust eye bolt mounting nuts as necessary,
but equally on all springs to achieve the best
spring tension to hold elements in place.
6.
Perform spring tension check (step 2 above).
7.
Repeat spring tension adjustment if necessary.
8.
Tighten stop nut on all eye bolts.
Page 15 of 32
F25385 (May 2010)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents