Download Print this page
Pentair Berkeley 10VT Series Installation, Operation And Maintenance Manual
Pentair Berkeley 10VT Series Installation, Operation And Maintenance Manual

Pentair Berkeley 10VT Series Installation, Operation And Maintenance Manual

Vertical turbine pumps

Advertisement

Quick Links

INSTALLATION, OPERATION AND MAINTENANCE MANUAL
VERTICAL TURBINE
PUMPS
10VT Series/12VT Series
BERKELEY
NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible
party who maintains the system.
BE990 | © 2018 Pentair plc. | 06/06/18
ENGLISH: PAGES 1-64
Installation, Operation and
Maintenance Manual
NOTE! To the installer: Please make sure you provide
this manual to the owner of the equip ment or to the
responsible party who maintains the system.

Advertisement

loading

Summary of Contents for Pentair Berkeley 10VT Series

  • Page 1 BERKELEY NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible party who maintains the system. BE990 | © 2018 Pentair plc. | 06/06/18...
  • Page 2 THIS PAGE INTENTIONALLY LEFT BLANK...
  • Page 3 Pump Identification Carefully record all of the following data from your pump nameplate. It will aid in obtaining the correct replacement parts for your pump. In addition to the nameplate, the pump serial number is also stamped on the discharge flange. Pump: Serial Number ______________________________________________________________ Model Number ______________________________________________________________...
  • Page 4: California Proposition 65 Warning

    Introduction please contact the factory as follows: Congratulations! You are the owner of the finest pump PENTAIR commercially available. If you give it the proper care as Fresno Service Center outlined and recommended by this manual, it will provide 5661 North Golden State Blvd you with reliable service and long life.
  • Page 5 Turbine and Propeller Pump Prestart-up and Start-up Checklist BERKELEY ®...
  • Page 6 THIS PAGE INTENTIONALLY LEFT BLANK...
  • Page 7 10VT SERIES/12VT SERIES Vertical Turbine Pumps Installation, Operation and Maintenance BERKELEY ®...
  • Page 8 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis. BERKELEY ®...
  • Page 9 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 10 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 11 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 12 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Shaft projection can be defined as the distance from the discharge bowl mounting surface (flange seat for flanged column, thread seat for threaded column) to the end of the pump shaft.
  • Page 13 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 14 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis BERKELEY ®...
  • Page 15 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 16 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual refer to the Berkeley/Fairbanks Nijhuis submittal drawings and BERKELEY ®...
  • Page 17 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis BERKELEY ®...
  • Page 18 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Assembly procedure for underground discharge units closely parallels that of standard pumps with above ground discharge heads. Always refer to the Berkeley or Fairbanks Nijhuis submittal drawings and setting plan to determine the proper location of discharge elbow centerline.
  • Page 19 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis BERKELEY ®...
  • Page 20 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 21 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Nijhuis BERKELEY ®...
  • Page 22 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 23 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 24 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 25 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual the sold conditions. You should always contact your nearest Berkeley or Fairbanks Nijhuis distributor or factory before operating the pumps at any condition other than that for which they were sold. Fairbanks Nijhuis Berkeley BERKELEY...
  • Page 26 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 27 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 28 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Berkeley VT Series Berkeley/Fairbanks Nijhuis Berkeley/Fairbanks Nijhuis BERKELEY ®...
  • Page 29 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Berkeley VT Series Berkeley/Fairbanks Nijhuis Berkeley VT Series BERKELEY ®...
  • Page 30 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Berkeley/ Fairbanks Nijhuis (Refer to drawing on page 53) BERKELEY ®...
  • Page 31 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 32 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual (Refer to drawing on page 51) (Refer to drawing on page 52) BERKELEY ®...
  • Page 33 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual (Refer to pages 51 thru 54) BERKELEY ®...
  • Page 34 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis (32) BERKELEY ®...
  • Page 35 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis Fairbanks Nijhuis BERKELEY ®...
  • Page 36 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 37 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis BERKELEY ®...
  • Page 38 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 39 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 40 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 41 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 42 You may order parts from your local Berkeley or Nijhuis Fairbanks Nijhuis distributor. Consult your local telephone yellow pages under "Pumps" for the office nearest you. Berkeley Nijhuis PENTAIR Fresno Service Center Berkeley 5661 North Golden State Blvd Fresno, California 93722 Berkeley...
  • Page 43 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fairbanks Nijhuis PENTAIR Fresno Service Center Fairbanks Nijhuis 5661 North Golden State Blvd Fresno, California 93722 (559) 266-0516 PENTAIR West Texas Service Center 9010 FM1585 Wolfforth, Texas 79382 BERKELEY ®...
  • Page 44 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Shaft Endplay 10VT 12VT At Full Bowl Size Diameter 10VT250/300 12VT500/600 10VT275 1.15 10VT460 1.25 10VT550 1.25 10VT700 1.25 10VT900 1.23 10VT1150 1.25 10VT1500 1.25 12VT550 1.25 12VT650 1.24 12VT900 1.47...
  • Page 45 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Table #7 Bowl Size Bowl/Wear ring Clearance Bearing Clearance Bronze Bearing Clearance Rubber Nominal Replacement Nominal Replacement Nominal Replacement 10VT250/300 .013 .012 .012 .020 .020 10VT .013 .012 .016 .020 .025...
  • Page 46 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 47 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fig. #1 Fig. #2 BERKELEY ®...
  • Page 48 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual Fig. #3 Fig. #4 BERKELEY ®...
  • Page 49 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ® ® BERKELEY ®...
  • Page 50 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ® ® BERKELEY ®...
  • Page 51 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ® ® BERKELEY ®...
  • Page 52 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ® ® BERKELEY ®...
  • Page 53 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ® ® BERKELEY ®...
  • Page 54 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ® ® BERKELEY ®...
  • Page 55 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual THIS PAGE INTENTIONALLY LEFT BLANK BERKELEY ®...
  • Page 56 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ® ® BERKELEY ®...
  • Page 57 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 58 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 10VT250/300 12VT500/600 THREADED COLUMN 10VT250 10VT300 12VT500 12VT600 MULTI STAGE WATER FLUSH SUCTION BELL SUCTION CASE BERKELEY ® ® MULTISTAGE WATERFLUSH BERKELEY ®...
  • Page 59 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 10VT250/300 12VT500/600 Bowl Assembly Parts List Part No. Description Deflector, Water Coupling, Shaft Shaft, Bowl Bearing, Top Bowl Bearing, Intermediate Bowl Bowl, Intermediate Impeller Collet, Impeller Suction Bell Suction Case Bearing, Suction Bowl Bearing, Connector...
  • Page 60 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 10VT275 10VT400 10VT550 10VT700 10VT900 10VT1150 10VT1500 810A 197A 800C 800A 800C 810B BERKELEY ® ® MULTISTAGE OPEN/CLOSED LINESHAFT BERKELEY ®...
  • Page 61 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 10VT275, 10VT400, 10VT550, 10VT700, 10VT900, 10VT1150, 10VT1500 Item number Description IMPELLER CLOSED OR OPEN NOT SHOWN OPEN IMPELLER ADAPTER 1-1/2 DIAMETER SHAFT CONNECTOR BEARING NOT SHOWN DISCHARGE ADAPTER 8”X6” FLNG DISCHARGE ADAPTER 8”X6”...
  • Page 62 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 12VT550 12VT650 12VT900 12VT1100 12VT1350 12VT1650 12VT2000 12VT2500 810A 197A 800C 800A 800C 810B BERKELEY ® ® MULTISTAGE OPEN LINESHAFT BERKELEY ®...
  • Page 63 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 12VT550, 12VT650, 12VT900, 12VT1100 12VT1350, 12VT1650, 12VT2000, 12VT2500 Item number Description IMPELLER CLOSED OR OPEN OPEN IMPELLER ADAPTER CONNECTOR BEARING DISCHARGE ADAPTER 10”X8” FLNG DISCHARGE ADAPTER 10”X8” STRT SUCTION BELL APAPTER SUCTION ADAPTER 10”X8”...
  • Page 64 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 5 / 16 3 / 4 1 / 2 7 / 8 1 / 32 3 / 4 17 / 32 Berkeley 10VT, 12VT Series Fairbanks Nijhuis 6M-17H 7000 Series BERKELEY ®...
  • Page 65 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual 10VT250 10VT300 12VT500 12VT600 Berkeley 10VT, 12VT Series Fairbanks Nijhuis 6M-17H 7000 Series BERKELEY ®...
  • Page 66 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 67 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 68 10VT SERIES/12VT SERIES - VERTICAL TURBINE PUMPS Installation, Operation and Maintenance Manual BERKELEY ®...
  • Page 69: Limited Warranty

    LIMITED WARRANTY DELIVERY: Buyer agrees to inspect all deliveries immediately. Any claim service. This warranty applies to the replacement part only and is not or shortages must be made in writing within ten (1 0) days alter Buyer extended to the product or any other component of the product being receives a shipment, and if not made, shall be deemed waived.

This manual is also suitable for:

Berkeley 12vt series