Connecting Applications To Ac Application Part (With Junction Box) - Navien LCB700-21RS Installation & Operation Manual

Condensing blue flame oil-fired boiler
Table of Contents

Advertisement

9.6 Connecting Applications to AC Application Part (With Junction Box)

9.6.1 Connecting the Junction Box Connection (S Plan)
The boiler is designed to be connected to a junction box (S Plan). The Junction box cables are connected to the terminals 1-5 of the
CONM4 in the AC application part and the CONZ3 (POWER OUT) in the AC power line part.
Room Stat
2
1
1
2
3
4
48
Connecting Electrical Supplies
Cylinder Stat
1
3
C
2
5
6
7
8
9
Boiler
Terminal
Block
1
2
3
4
5
1
2
3
Grey
Grey
Brown
HW
Blue
Motor
Green/Yellow
2-Port Zone Valve
Brown
HTG
Blue
Motor
Green/Yellow
2-Port Zone Valve
Orange
Orange
Wiring
10
Centre
AC Application and
AC Power Line Parts
CH_ON
DHW_ON
DHW_OFF
Switched Live
L
L
N
PE
CH_ON
DHW_ON
DHW_OFF
Switched
Live
L
L
N
PE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents