Download Print this page
WE-EF RAIL66 Series Installation And Maintenance Instructions Manual

WE-EF RAIL66 Series Installation And Maintenance Instructions Manual

Rail66 projector

Advertisement

Quick Links

Do not open during installation
This product is factory-sealed.
Refer to the instructions contained in this
document for details.
Surge Protection
This product features built-in surge protection circuitry in compliance with
applicable standards.
For comprehensive protection of a luminaire installation against lightning and
electrical surges, it is essential to cover mains supply and data input lines at
the distribution board level, by using respective primary (Type 1) and secondary
(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.
Warning
Ensure that all required surge protection measures are in place and activated
prior to luminaire installation. Also, disconnect luminaires before operating
high-power devices such as, for example, electrical arc welders.
WE-EF LEUCHTEN
Installation and Maintenance
Instructions
RAIL66 Projector
RAIL66 version
FLC121 #7 LED
FLC131 #7 LED
FLC141 #7 LED
Space frame version
FLC121 #7 LED
FLC131 #7 LED
FLC141 #7 LED

Advertisement

loading
Need help?

Need help?

Do you have a question about the RAIL66 Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Space frame seriesRail66 flc121 #7 ledRail66 flc131 #7 ledRail66 flc141 #7 ledSpace frame flc121 #7 ledSpace frame flc131 #7 led ... Show all