Download Print this page

IBM System i Manual page 131

Hide thumbs Also See for System i:

Advertisement

Routing the cables through the cable-management arm
__
After you attach the cables to the cable-management arm, go to the front of the rack and move the system
drawer in and out. Observe the cables and cable-management-arm movement to verify that the cables are
not binding.
After you finish
__
Did you receive a cable hook with your rack shipment?
v No. Proceed to the next item.
v Yes. The cable hook manages the server cables in the back of the rack. To install the cable hook, slide it into
the slots that are located on the back of the rack as shown here:
__
Return to your initial server setup checklist and complete the next step.
119
Cabling your server

Advertisement

loading

This manual is also suitable for:

System p9405-5209406-5209406-5259407-515