List of parts TITAN Arch+ Title Length, 12m2 extension Arch (top, centre) 2280 mm Arch (top, centre) WITH MORE HOLES 2280 mm Arch lateral (left, right) 1210 mm Arch lateral (left, right) WITH MORE HOLES 1210 mm Lateral lower arch stud (left, right) 940 mm Lateral lower arch stud (left, right) WITH 940 mm...
Installation procedure Prepare and level the greenhouse installation site according to the dimensions of the greenhouse purchased. The installation instructions will describe how to install a 4 m long “TITAN Arch+ ” greenhouse. In this case, we present a scheme for digging or drilling holes in the ground at the edges of a prepared rectangle along the entire perimeter of a greenhouse with dimensions of ~ 25 cm in diameter, ~ 40 cm in depth.
Page 11
The front part foundation installation (The rear part installation is the same) Screw M5-16 (No.19) M5 nut 1 Fig. Fasteners to the ground installation (200 mm) Priekinės pamatinės dalies sujungimas (galinė dalis dalis montuojama taip pat) screw M5-45 M5 nut 2 Fig.
Page 12
Connection of the foundation side part (in the left and in the right side installation the same) M5 nut (No.19) (No.5) Screw M5-40 Screw M5-16 Screws M5-40 Screws M5-16 Screws M5-45 3 Fig. Installation of lateral lower M5 nut arch part (No.19) Screw (No.6)
Page 13
a = b NOTE: The diagonal lengths must be equal! holes 5 Fig. Installation of lateral lower arch part and connection plates M5 nut (No. 33) Screw M5-16 6 Fig.
Page 14
2000mm (No. 8) Screw (No. 32) (No. 31) M5-16 2000 mm 643 mm 643 mm 643 mm 200 mm 200 mm 200 mm 200 mm 2000 mm 2000 mm 643 mm 643 mm 643 mm 643 mm 643 mm 643 mm 200 mm 200 mm 200 mm...
Page 15
Installation of the side arches Please do the same action on the other side of greenhouse! 8 Fig. Installation of the Arch fastening crossbars 643 mm 643 mm 643 mm 9 Fig.
Page 16
Screw Self-tapping screw M5 nut M5-16 4,2x19 1320 mm (No. 13) Screws M5-16 Self-tapping screws 4,2x19 Installation of the strut of door-window transverse 10 Fig. Fastening of the transverse struts of door window (the front part) No. 13 965 mm 970 mm 970 mm GROUND...
Page 17
Installation of the side fastening (In the front and rear parts). Screws M5-16 Screws M5-16 Screws M5-16 12 Fig. Fastening of the transverse struts of door window (rear part) No. 13 No. 14 No. 12 No. 12 965 mm 970 mm 970 mm GROUND 13 Fig.
Page 18
Installation of the polycarbonate to the side parts and door cover (front 5 Side part 6 Side part 9 Top door window polycarbonate - gaskets, transparent - gaskets, transparent (half) 14 Fig. Installation of the polycarbonate to the side parts and the bottom of the window (rear) 3 The bottom of the window 7 Side part...
Page 19
Door part Door horizontal Door (window) installation with hinges part 950 mm 885 mm Screws M5-40 Screws M5-40 Screws M5-40 Door part Door transverse with handles part 885 mm 885 mm Screws Screws M5-16 M5-16 Screws M5-40 Screws M5-40 Screws M5-40 16 Fig.
Page 20
Installation of the polycarbonate to the side parts and doors (front) 1 The upper part of door The bottom part of the door 5 Side part 6 Side part Top door - window polycarbonate - full gasket - gasket (half) 18 Fig.
Page 23
Door handle installation Screw Handle Lock M4-45 NOTE: Do not over tighten the srews. If the handle turns hard, please t o loos e slightly the screws (M4-45). 22 Fig. Door holder installation (upper part) 23 Fig.
Need help?
Do you have a question about the TITAN Arch+ 320 and is the answer not in the manual?
Questions and answers