11.7 STABILIZER BASE INSTALLATION
TOOLS REQUIRED
¥1/4 Electric Drill Motor
¥1/4 (6mm) Nut Driver or Hex Socket
¥ Tape Measure
¥#2 Phillips Screwdriver
Procedure (NOTE: Install mounting plates before assembling the archway)
1. Examine the location and determine the best routing for the power cord.
2. For each panel, remove and discard the two (2) rubber bumpers located on the bottom of
the panels. these holes will be used for attaching mounting plates to panels.
3. Using the supplied 3/32 (2.3mm) drill bit, extend the depth of the mounting holes to 2
(50mm) deep.
4. Attach the plates (with the edges pointing away from the panel using the supplied 2 long
screws.
CAUTION:
The power cord must be installed in the correct Panel location (see Page 8, 3.2.2) before
the plate can be secured. DO NOT PINCH the cord between the panel and the plate. Ensure
that the head of the screw is tight against the plate to prevent the panels from sliding.
5. Assemble the unit.
6. Place unit in upright position at selected operating location.
7. Secure the unit to the floor using 1/4 (6mm) mounting screws (not supplied). The mount-
ing holes in the plates may be used as a drill guide.
' 2000 GARRETT METAL DETECTORS, INC.
4/30/00
MAGNASCANNER CS 5000
OWNERS MANUAL
PARTS LIST
¥2-Mounting Plate
¥4-Screw #8x2 Self-Tapping 1/4
¥1-Drill Bit 3/32
¥1-Instruction Sheet
42
PN 11674XX
Revised