Basic Operations; Boot System; Shut Down System - POMCube iCAN NetZero Plus User Manual

Hide thumbs Also See for iCAN NetZero Plus:
Table of Contents

Advertisement

covers
Conduit
Wire protection

Basic Operations

Boot System

WARNING: Proceed to the following steps only after installation checklist is
completed.
Switch on the POWER switch on the BCMS module, press START button for 1s
(1)
and release, wait around 60 seconds until the BCMS and Battery Modules start
normally, and
Switch on the PV SWITCH on the Universal PCS, and
(2)
Press the ON/OFF button on Universal PCS, wait around 60 seconds until the
(3)
system starts normally, and
Switch on the AC SWITCH on Universal PCS.
(4)
NOTE: When the system starts working properly, put the door of battery system
back to the cabinet. Lock it and keep the key well.

Shut Down System

WARNING: Shut down the device and switch off all the external switches
from the home electrical panel for maintenance or extended period of non-
use.
Press the ON/OFF button on Universal PCS, and
(1)
Switch off the POWER switch on the BCMS module
(2)
Switch off the PV SWITCH on the Universal PCS, and
(3)
Switch off the AC SWITCH on Universal PCS.
(4)
All conduits are tightly installed and sealed.
Insulated cover of wires are not at risk of being cut or
damaged.
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents