Safety Check

WARNING: Check thoroughly of all operations in the installation, ensuring
the system is installed correctly, esp. DC and AC voltages are in the specified
ranges of iCAN NetZero Plus.
Items
PV connection
Battery
connection
AC breaker
Grid connection
Generator
connection
Wiring
Wiring box
Teble 5.8.1 Installation Checklist
Notes
External breaker is installed.
The appropriate breaker is installed as specified for iCAN
NetZero Plus.
The breaker is turned OFF.
Open-circuit voltage of PV arrays is within the allowed
range.
Positive and negative polarities are correct.
There is no voltage on the battery ports.
Positive, negative and REF polarities are correct.
AC breaker is turned OFF.
External breaker is installed.
The appropriate breaker is installed as specified for iCAN
NetZero Plus.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
External breaker is installed.
The appropriate breaker is installed as specified for iCAN
NetZero Plus.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
All cables are wired tightly.
All wiring covers are screwed tightly.