Checklist for the insertion of the range
Base instruction how to proceed with the installation and commissioning
A= Range delivered in 1 piece.
B= Range delivery in different sections (Separated Top and base)
Picture Description of work step
A
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Inst. Manual Master DEF
Read complete instruction carefully
Check drawing
mind special hints on the drawing
Offload range (do not bend!)
Glasses may break and the frame may be crushed
Flap down the operation panels
Remove side panels (if existing)
Remove fryers and pasta cookers (if existing)
Loose screws and nut between top and below fundament
Check if cables are not stuck
Remove top element and bring to installation site
Attention! Do not bend top element!
Transport below fundament to installation site
Transport plinth (if existing) to installation site
Place plinth (if existing)
Put below fundament on plinth (see drawing, measuring)
Level out below fundament
Place top element on below fundament
take care of wires
Connect top element with below fundament
screws and nuts
Level out top element
Install fryers and pasta cookers (if existing) – by screws and
cemented
Connect drains
Connect pressure lines (water, gas)
Connect cables
The range was completely wired and tested in factory - all
cables/connections are in place and can be connected effortless
(see description and electrical scheme)
Check generators
Assemble side panels (if existing)
Close all panels, doors
Connect range to power supply (installation compartment)
Test the range
Important!
Check assignment of knobs to the corresponding zones