Download Print this page

IAC INDUSTRIES SMS S1 SMART MOBILE STATION Assembly Instructions Manual page 47

Advertisement

SMS BASE / UPRIGHT ASSEMBLY
SMS UPRIGHT SUB-ASSEMBLY
LAMINATE PANELS REMOVED
IN THE FRONT AND REAR
Install the casters to the SMS base. Thread the 1/2-13 hex nuts all the way onto the stems of the casters. Then thread
the caster stems into the threaded inserts in the SMS base. Use a 3/4" end wrench or an adjustable wrench to tighten
the 1/2-13 hex nut against the base.
Prepare the SMS Upright for installation by removing the laminate trim panels from the front and rear of the SMS
Upright. While holding the upright above the base, plug the SMS Upright Powercord (coming from the bottom of the
upright) into the SMS Base Powercord (which is coming up through the hole in the base), and while feeding the
powercord back into the base, slide the upright down over the brackets on the base. The electrical panel should be to
the right, as shown above. Make sure the upright is all the way down, and attach the Upright to the Base with the
5/16-18 Hex Head Bolts (item C) and 5/16 Flat Washer (item D). Replace the laminate trim panels in the SMS Upright.
Install the SS Top Cap (item E) see page 6
Plug the main powercord into a standard AC wall outlet and flip the switch on the back of the SMS Base. The switch
will illuminate red. At this point, the electrical panel of the upright should be receiving power.
ELECTRICAL OUTLETS
SMS UPRIGHT POWERCORD
SMS BASE POWERCORD
6
SMS MAIN POWERCORD

Advertisement

loading

Related Products for IAC INDUSTRIES SMS S1 SMART MOBILE STATION