Download Print this page

IAC INDUSTRIES SMS S1 SMART MOBILE STATION Assembly Instructions Manual page 38

Advertisement

SMS S4 Cord Wrap Bracket & Cord Management Channel
Install 5/16-18 x .75 square head bolts (item F), 5/16 flat washer
(item B), and 5/16-18 hex head keps nuts (item G) to the SMS Duct
Channel Bracket (item H). Do not tighten this hardware.
Install two SMS Duct Channel Brackets to the upright by placing the
heads of the square bolts into a milled cut out in the rear slot of the
upright . Adjust the SMS Duct Channel Brackets to be the same
distance apart as the holes in the LAN Wire Management Channel
(item6), and tighten the nuts. Place the Channel over the studs in
the two Duct Channel Brackets and secure with #10 Hex nuts and
#10 flat washers (items K and L).
The shelf is not shown as installed here. This allows the installation of the Cord Wrap
Bracket and the LAN Wire Management Channel to be seen more clearly.
Install 5/16-18 x .75 square head bolts (item F), 5/16 flat washer (item B), and 5/16-18 hex
head keps nuts (item G) to the cord wrap bracket (item J). Do not tighten this hardware.
Install the cord wrap bracket to the upright by placing the head of
the square bolt into a milled cut out in the rear slot of the upright (if
you want the wrap in the rear), or in the front slot (if you want the
wrap to the front). Adjust the cord wrap bracket to the desired
height, and tighten the nut....being careful not to overtighten (10 ft
lbs max).
9

Advertisement

loading

Related Products for IAC INDUSTRIES SMS S1 SMART MOBILE STATION